Install EV Chargers in Burbank, California

Install EV chargers or analyze a site in Burbank, California. 130 existing public charging locations (10 DC fast, 120 Level 2). Free 0–100 profitability score on any Burbank address from EV Data Map by Charge Rigs.

Burbank, California is served by 130 public electric vehicle charging locations operating 293 individual chargers — an average of 2.3 chargers per site. Of those locations, 10 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 120 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Burbank is ChargePoint Network with 117 locations, followed by Tesla with 3. Average DC fast power across the city is approximately 195 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Burbank and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Burbank

Burbank's public EV charging landscape is notably shaped by the dominance of ChargePoint Network, which accounts for 90% of the 130 available charging stations. With 10 DC fast chargers averaging 195 kW and a significant portion (60%) rated at 150 kW or higher, the city offers a modern solution for quick charging needs. The fastest stall at 350 kW positions Burbank as a competitive locale for high-power charging options, making it appealing to drivers prioritizing speed. In a city where 8% of charging locations are DC fast, understanding this robust infrastructure is vital for any site developer or operator aiming to attract EV drivers in a market heavily influenced by the existing network's reliability and uptime.

Burbank charging by the numbers

Locations
130
Chargers
293
DC Fast locations
10
Level 2 locations
120

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 2.3. Average DC fast power: 195 kW.

Burbank charging — local snapshot

Top operator share
ChargePoint Network runs 90% of public locations across 9 networks.
Average DC fast power
195 kW (fastest stall: 350 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 130 locations
Estimated DC ports
73 fast-charging ports city-wide

Charging networks in Burbank

The following operators run public charging in Burbank, ranked by number of locations.

Featured charging locations in Burbank

A selection of higher-power public charging locations across Burbank, sorted by power level.

  1. BOA Magnolia Park CA9-151 (Burbank, CA) — Burbank, CA, 91505 (Electrify America · DC Fast · 350 kW)
  2. Walmart 5686 (Burbank, CA) — Burbank, CA, 91502 (Electrify America · DC Fast · 350 kW)
  3. Plaza Del Sol (Burbank, CA) — Burbank, CA, 91505 (Electrify America · DC Fast · 350 kW)
  4. Burbank, CA - North San Fernando Boulevard - Tesla Supercharger — Burbank, CA, 91504 (Tesla · DC Fast · 250 kW)
  5. Burbank, CA - North Victory Boulevard - Tesla Supercharger — Burbank, CA, 91506 (Tesla · DC Fast · 250 kW)
  6. Burbank Town Center - Tesla Supercharger — Burbank, CA, 91502 (Tesla · DC Fast · 150 kW)
  7. BWP EV CHARGE DCFC AIRPORT 1 — Burbank, CA, 91505 (ChargePoint Network · DC Fast · 62.5 kW)
  8. BWP EV CHARGE DCFC LAKESIDE 1 — Burbank, CA, 91505 (ChargePoint Network · DC Fast · 62.5 kW)
  9. BWP EV CHARGE DCFC BWP LOT 2 — Burbank, CA, 91502 (ChargePoint Network · DC Fast · 62.5 kW)
  10. BWP EV CHARGE DCFC BWP LOT 1 — Burbank, CA, 91502 (ChargePoint Network · DC Fast · 62.5 kW)
  11. INTRO BURBANK PARKING 2 BLD 2 — Burbank, CA, 91502 (ChargePoint Network · Level 2 · 9.6 kW)
  12. INTRO BURBANK LVL 4SPACE 4020 — Burbank, CA, 91502 (ChargePoint Network · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Burbank specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 120 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Burbank, California?
There are 130 public electric vehicle charging locations in Burbank, California, with a combined 293 individual chargers. 10 locations offer DC fast charging and 120 provide Level 2 charging.
What is the largest EV charging network in Burbank?
ChargePoint Network operates the most public charging locations in Burbank with 117 sites, followed by Tesla with 3 sites.
How much does it cost to install an EV charger in Burbank?
Level 2 EV chargers in Burbank typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Burbank?
Most Burbank projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Burbank?
A typical commercial Level 2 installation in Burbank energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Burbank take to become profitable?
Payback in Burbank depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage