Install EV chargers or analyze a site in Universal City, California. 60 existing public charging locations (2 DC fast, 58 Level 2). Free 0–100 profitability score on any Universal City address from EV Data Map by Charge Rigs.
Universal City, California is served by 60 public electric vehicle charging locations operating 148 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (3%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 58 (97%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Universal City is ChargePoint Network with 54 locations, followed by NOODOE with 2. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Universal City and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Universal City
In Universal City, California, the EV charging landscape is significantly shaped by ChargePoint Network, commanding 90% of the city’s 60 public locations and offering substantial reliability for users. With only two DC fast charging sites, accounting for just 3% of total locations but featuring impressive average power outputs of 150 kW — and peaking at 250 kW — the selection for high-speed charging is limited yet modern. Notably, 50% of the DC fast sites belong to the 150 kW-class or higher, positioning future competitors with an opportunity to leverage high-power options between 150–350 kW to attract EV drivers. Meanwhile, the predominance of Level 2 chargers caters to longer dwell times, indicating a balanced approach to varying charging needs across the city.
Universal City charging by the numbers
Locations
60
Chargers
148
DC Fast locations
2
Level 2 locations
58
DC fast share: 3% of locations. Level 2 share: 97%. Average chargers per site: 2.5. Average DC fast power: 150 kW.
Universal City charging — local snapshot
Top operator share
ChargePoint Network runs 90% of public locations across 5 networks.
Average DC fast power
150 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
3% DC fast / 97% Level 2 across 60 locations
Estimated DC ports
10 fast-charging ports city-wide
Charging networks in Universal City
The following operators run public charging in Universal City, ranked by number of locations.
ChargePoint Network — 54 locations
NOODOE — 2 locations
Tesla Destination — 2 locations
Non-Networked — 1 location
Tesla — 1 location
Featured charging locations in Universal City
A selection of higher-power public charging locations across Universal City, sorted by power level.
Sheraton Universal Hotel - Tesla Supercharger — Universal City, CA, 91608 (Tesla · DC Fast · 250 kW)
Sheraton Universal Hotel DC — Universal City, CA, 91608 (NOODOE · DC Fast · 50 kW)
10UCP STUDIO/5125 01 — Universal City, CA, 91602 (ChargePoint Network · Level 2 · 12 kW)
Universal City, CA (Pay to Park) - Tesla Destination — Universal City, CA, 90068 (Tesla Destination · Level 2 · 7.2 kW)
Universal Studios Hollywood - Tesla Destination — Universal City, CA, 91608 (Tesla Destination · Level 2 · 7.2 kW)
Universal City Hilton — Universal City, CA, 91608 (Non-Networked · Level 2 · 7.2 kW)
Sheraton Universal Hotel AC — Universal City, CA, 91608 (NOODOE · Level 2 · 7 kW)
USH PARKING ET 8 — Universal City, CA, 91608 (ChargePoint Network · Level 2 · 6.5 kW)
STUDIO 2160 B1 MOTOC — Universal City, CA, 91602 (ChargePoint Network · Level 2 · 6.5 kW)
STUDIO 2160-STATION 04 — Universal City, CA, 91608 (ChargePoint Network · Level 2 · 6.5 kW)
STUDIO 2160-STATION 03 — Universal City, CA, 91608 (ChargePoint Network · Level 2 · 6.5 kW)
STUDIO 2160-STATION 02 — Universal City, CA, 91608 (ChargePoint Network · Level 2 · 6.5 kW)
Nearby cities with EV charging coverage
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Universal City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 58 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Universal City, California?
There are 60 public electric vehicle charging locations in Universal City, California, with a combined 148 individual chargers. 2 locations offer DC fast charging and 58 provide Level 2 charging.
What is the largest EV charging network in Universal City?
ChargePoint Network operates the most public charging locations in Universal City with 54 sites, followed by NOODOE with 2 sites.
How much does it cost to install an EV charger in Universal City?
Level 2 EV chargers in Universal City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Universal City?
Most Universal City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Universal City?
A typical commercial Level 2 installation in Universal City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Universal City take to become profitable?
Payback in Universal City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.