Install EV Chargers in Oxnard, California

Install EV chargers or analyze a site in Oxnard, California. 43 existing public charging locations (10 DC fast, 33 Level 2). Free 0–100 profitability score on any Oxnard address from EV Data Map by Charge Rigs.

Oxnard, California is served by 43 public electric vehicle charging locations operating 100 individual chargers — an average of 2.3 chargers per site. Of those locations, 10 (23%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 33 (77%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Oxnard is ChargePoint Network with 32 locations, followed by Non-Networked with 5. Average DC fast power across the city is approximately 99 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Oxnard and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Oxnard

Oxnard, California's EV charging landscape is significantly shaped by the dominance of ChargePoint Network, which operates 74% of the city's 43 public charging locations. With 10 DC fast stations averaging 99 kW, and 30% rated at 150 kW or higher, operators targeting higher power offerings will find opportunities for competitive differentiation. The presence of a mix of Level 2 chargers caters to longer dwell times, while the relatively older fleet of DC fast chargers may lead to varying user experiences. The local market is poised for growth as charging needs evolve, especially for new entrants looking to position themselves within the 150–350 kW range that appeals to drivers prioritizing quick charging options.

Oxnard charging by the numbers

Locations
43
Chargers
100
DC Fast locations
10
Level 2 locations
33

DC fast share: 23% of locations. Level 2 share: 77%. Average chargers per site: 2.3. Average DC fast power: 99 kW.

Oxnard charging — local snapshot

Top operator share
ChargePoint Network runs 74% of public locations across 7 networks.
Average DC fast power
99 kW (fastest stall: 350 kW)
High-power share
30% of DC fast sites are 150 kW-class or higher
Mix
23% DC fast / 77% Level 2 across 43 locations
Estimated DC ports
41 fast-charging ports city-wide

Charging networks in Oxnard

The following operators run public charging in Oxnard, ranked by number of locations.

Featured charging locations in Oxnard

A selection of higher-power public charging locations across Oxnard, sorted by power level.

  1. Grocery Outlet – Oxnard — Oxnard, CA, 93030 (eVgo Network · DC Fast · 350 kW)
  2. Target T2760 (Oxnard, CA) — Oxnard, CA, 93036 (Electrify America · DC Fast · 150 kW)
  3. The Collection at RiverPark - Tesla Supercharger — Oxnard, CA, 93036 (Tesla · DC Fast · 150 kW)
  4. HY SALES CA359 DC FAST 1 — Oxnard, CA, 93036 (ChargePoint Network · DC Fast · 62.5 kW)
  5. HY SALES CA359 DC FAST 2 — Oxnard, CA, 93036 (ChargePoint Network · DC Fast · 62.5 kW)
  6. MBZOXNARD FAST CHARGE 1 — Oxnard, CA, 93036 (ChargePoint Network · DC Fast · 62.5 kW)
  7. Esplanade Shopping Center — Oxnard, CA, 93036 (eVgo Network · DC Fast · 50 kW)
  8. Alexander Buick GMC Oxnard — Oxnard, CA, 93036 (EV Connect · DC Fast · 50 kW)
  9. OXNARD STATIONS OXNARD FAST 2 — Oxnard, CA, 93033 (ChargePoint Network · DC Fast · 24 kW)
  10. OXNARD STATIONS OXNARD FAST 1 — Oxnard, CA, 93033 (ChargePoint Network · DC Fast · 24 kW)
  11. HY SALES CA359 CUSTOMER PARKIN — Oxnard, CA, 93036 (ChargePoint Network · Level 2 · 19.2 kW)
  12. HY SALES CA359 STATION 2 — Oxnard, CA, 93036 (ChargePoint Network · Level 2 · 12 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Oxnard specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 33 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Oxnard, California?
There are 43 public electric vehicle charging locations in Oxnard, California, with a combined 100 individual chargers. 10 locations offer DC fast charging and 33 provide Level 2 charging.
What is the largest EV charging network in Oxnard?
ChargePoint Network operates the most public charging locations in Oxnard with 32 sites, followed by Non-Networked with 5 sites.
How much does it cost to install an EV charger in Oxnard?
Level 2 EV chargers in Oxnard typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Oxnard?
Most Oxnard projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Oxnard?
A typical commercial Level 2 installation in Oxnard energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Oxnard take to become profitable?
Payback in Oxnard depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage