Install EV chargers or analyze a site in Ventura, California. 48 existing public charging locations (8 DC fast, 40 Level 2). Free 0–100 profitability score on any Ventura address from EV Data Map by Charge Rigs.

Ventura, California is served by 48 public electric vehicle charging locations operating 153 individual chargers — an average of 3.2 chargers per site. Of those locations, 8 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 40 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Ventura is ChargePoint Network with 25 locations, followed by Non-Networked with 6. Average DC fast power across the city is approximately 203 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ventura and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Ventura

Ventura boasts a diverse EV charging landscape with 48 public locations powered by 11 distinct operators, ensuring competitive pricing and uptime. ChargePoint Network leads with over half the market, yet the variety allows drivers to select charging options based on power and amenities. With an average DC fast charging power of 203 kW and 63% of fast stations rated at 150 kW or higher, the city offers ultra-fast charging capabilities, catering to the needs of EV drivers seeking quick turnaround times. The presence of a robust DC fast charging network, comprising 17% of total locations, alongside numerous Level 2 options, positions Ventura as a critical hub for EV infrastructure in the region.

Ventura charging by the numbers

Locations
48
Chargers
153
DC Fast locations
8
Level 2 locations
40

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 3.2. Average DC fast power: 203 kW.

Ventura charging — local snapshot

Top operator share
ChargePoint Network runs 52% of public locations across 11 networks.
Average DC fast power
203 kW (fastest stall: 350 kW)
High-power share
63% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 48 locations
Estimated DC ports
43 fast-charging ports city-wide

Charging networks in Ventura

The following operators run public charging in Ventura, ranked by number of locations.

Featured charging locations in Ventura

A selection of higher-power public charging locations across Ventura, sorted by power level.

  1. Ventura County Credit Union Telephone Road (Ventura, CA) — Ventura, CA, 93003 (Electrify America · DC Fast · 350 kW)
  2. Macerich Pacific View Mall (Ventura, CA) — Ventura, CA, 93003 (Electrify America · DC Fast · 350 kW)
  3. Ventura, CA — Ventura, CA, 93003 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  4. Denny's - Tesla Supercharger — Ventura, CA, 93003 (Tesla · DC Fast · 250 kW)
  5. Gas Works - Tesla Supercharger — Ventura, CA, 93001 (Tesla · DC Fast · 250 kW)
  6. US Bank Ventura — Ventura, CA, 93003 (EVCS · DC Fast · 50 kW)
  7. Trader Joe's Pacific View Mall North — Ventura, CA, 93003 (eVgo Network · DC Fast · 50 kW)
  8. Paradise Chevrolet — Ventura, CA, 93003 (Non-Networked · DC Fast · 25 kW)
  9. Patagonia HQ — Ventura, CA, 93001 (ABM · Level 2 · 19 kW)
  10. Gold Coast Acura — Ventura, CA, 93003 (Blink Network · Level 2 · 10.8 kW)
  11. Global Realty Corp — Ventura, CA, 93004 (Blink Network · Level 2 · 8.6 kW)
  12. Ventura County Government Center — Ventura, CA, 93009 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Ventura specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 40 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Ventura, California?
There are 48 public electric vehicle charging locations in Ventura, California, with a combined 153 individual chargers. 8 locations offer DC fast charging and 40 provide Level 2 charging.
What is the largest EV charging network in Ventura?
ChargePoint Network operates the most public charging locations in Ventura with 25 sites, followed by Non-Networked with 6 sites.
How much does it cost to install an EV charger in Ventura?
Level 2 EV chargers in Ventura typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Ventura?
Most Ventura projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Ventura?
A typical commercial Level 2 installation in Ventura energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Ventura take to become profitable?
Payback in Ventura depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.