Install EV Chargers in Carmichael, California

Install EV chargers or analyze a site in Carmichael, California. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Carmichael address from EV Data Map by Charge Rigs.

Carmichael, California is served by 12 public electric vehicle charging locations operating 47 individual chargers — an average of 3.9 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Carmichael is ChargePoint Network with 7 locations, followed by LOOP with 2. Average DC fast power across the city is approximately 350 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Carmichael and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Carmichael

Carmichael, California, stands out in the EV charging landscape with 12 public charging locations, highlighted by a robust offering of two ultra-fast DC fast chargers, each delivering an impressive 350 kW. This set-up not only ensures that drivers can recharge quickly but also positions the city competitively within the regional charging network ecosystem, where ChargePoint Network dominates with 58% of the sites. With 17% of the total public charging locations categorized as DC fast, Carmichael effectively balances high-speed options with longer-dwell Level 2 charging. As new entrants consider the local market, the prevalence of high-capacity DC fast chargers becomes a key attraction for EV users selecting charging stops, underscoring Carmichael's strategic advantage in the surrounding area.

Carmichael charging by the numbers

Locations
12
Chargers
47
DC Fast locations
2
Level 2 locations
10

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 3.9. Average DC fast power: 350 kW.

Carmichael charging — local snapshot

Top operator share
ChargePoint Network runs 58% of public locations across 4 networks.
Average DC fast power
350 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 12 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Carmichael

The following operators run public charging in Carmichael, ranked by number of locations.

Featured charging locations in Carmichael

A selection of higher-power public charging locations across Carmichael, sorted by power level.

  1. Smart & Final Carmichael — Carmichael, CA, 95608 (eVgo Network · DC Fast · 350 kW)
  2. Ethan Conrad #82 — Carmichael, CA, 95608 (eVgo Network · DC Fast · 350 kW)
  3. Walnut Gardens — Carmichael, CA, 95608 (LOOP · Level 2 · 7.7 kW)
  4. The Brookside Apartments — Carmichael, CA, 95608 (LOOP · Level 2 · 7.7 kW)
  5. REDAPTIVE GENERAL DUAL — Carmichael, CA, 95608 (ChargePoint Network · Level 2 · 7.7 kW)
  6. REDAPTIVE ADA SINGLE — Carmichael, CA, 95608 (ChargePoint Network · Level 2 · 7.7 kW)
  7. REDAPTIVE EMPLOYEE #1 — Carmichael, CA, 95608 (ChargePoint Network · Level 2 · 7.7 kW)
  8. REDAPTIVE EMPLOYEE #2 — Carmichael, CA, 95608 (ChargePoint Network · Level 2 · 7.7 kW)
  9. Carmichael Library — Carmichael, CA, 95608 (Non-Networked · Level 2 · 7.2 kW)
  10. HOSPITAL MSJ_GARAGE 1 — Carmichael, CA, 95608 (ChargePoint Network · Level 2 · 6.5 kW)
  11. HOSPITAL MSJ_GARAGE 2 — Carmichael, CA, 95621 (ChargePoint Network · Level 2 · 6.5 kW)
  12. HOSPITAL MSJ_GARAGE 3 — Carmichael, CA, 95621 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Carmichael specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Carmichael, California?
There are 12 public electric vehicle charging locations in Carmichael, California, with a combined 47 individual chargers. 2 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Carmichael?
ChargePoint Network operates the most public charging locations in Carmichael with 7 sites, followed by LOOP with 2 sites.
How much does it cost to install an EV charger in Carmichael?
Level 2 EV chargers in Carmichael typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Carmichael?
Most Carmichael projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Carmichael?
A typical commercial Level 2 installation in Carmichael energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Carmichael take to become profitable?
Payback in Carmichael depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage