Install EV Chargers in Carson, California

Install EV chargers or analyze a site in Carson, California. 97 existing public charging locations (6 DC fast, 91 Level 2). Free 0–100 profitability score on any Carson address from EV Data Map by Charge Rigs.

Carson, California is served by 97 public electric vehicle charging locations operating 225 individual chargers — an average of 2.3 chargers per site. Of those locations, 6 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 91 (94%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Carson is ChargePoint Network with 82 locations, followed by Non-Networked with 5. Average DC fast power across the city is approximately 167 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Carson and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Carson

In Carson, California, the public charging landscape is heavily influenced by ChargePoint Network, which operates 85% of the city’s 97 public charging locations. With a strong emphasis on high-power solutions, 50% of the six DC fast charging sites are classified as 150 kW or higher, featuring an average output of 167 kW and a peak of 350 kW. This high-capacity infrastructure enhances appeal for EV drivers seeking quick top-ups. However, the predominance of Level 2 charging stations caters predominantly to longer-dwell needs, highlighting a potential market opportunity for developers focusing on high-demand fast charging solutions. As the surrounding cities also provide additional context, assessing local traffic and demographic trends is crucial for identifying underserved areas in this dynamic market.

Carson charging by the numbers

Locations
97
Chargers
225
DC Fast locations
6
Level 2 locations
91

DC fast share: 6% of locations. Level 2 share: 94%. Average chargers per site: 2.3. Average DC fast power: 167 kW.

Carson charging — local snapshot

Top operator share
ChargePoint Network runs 85% of public locations across 9 networks.
Average DC fast power
167 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
6% DC fast / 94% Level 2 across 97 locations
Estimated DC ports
35 fast-charging ports city-wide

Charging networks in Carson

The following operators run public charging in Carson, ranked by number of locations.

Featured charging locations in Carson

A selection of higher-power public charging locations across Carson, sorted by power level.

  1. Target T2328 (Carson, CA) — Carson, CA, 90745 (Electrify America · DC Fast · 350 kW)
  2. DoubleTree - Tesla Supercharger — Carson, CA, 90745 (Tesla · DC Fast · 250 kW)
  3. Carson Civic Center - Tesla Supercharger — Carson, CA, 90745 (Tesla · DC Fast · 250 kW)
  4. KOC CPE250-1 — Carson, CA, 90745 (ChargePoint Network · DC Fast · 50 kW)
  5. Carson Nissan — Carson, CA, 90745 (Non-Networked · DC Fast · 50 kW)
  6. Mainfreight — Carson, CA, 90746 (CHAEVI · DC Fast · 50 kW)
  7. HOWMET-CARSON EVSE 4 — Carson, CA, 90745 (ChargePoint Network · Level 2 · 13.4 kW)
  8. HOWMET-CARSON EVSE 2 — Carson, CA, 90745 (ChargePoint Network · Level 2 · 13.4 kW)
  9. HOWMET-CARSON EVSE 3 — Carson, CA, 90745 (ChargePoint Network · Level 2 · 13.4 kW)
  10. HOWMET-CARSON EVSE 1 — Carson, CA, 90745 (ChargePoint Network · Level 2 · 13.4 kW)
  11. Union South Bay — Carson, CA, 90745 (Blink Network · Level 2 · 11.5 kW)
  12. Los Angeles - Page One Automotive — Carson, CA, 90248 (TURNONGREEN · Level 2 · 11 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Carson specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 91 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Carson, California?
There are 97 public electric vehicle charging locations in Carson, California, with a combined 225 individual chargers. 6 locations offer DC fast charging and 91 provide Level 2 charging.
What is the largest EV charging network in Carson?
ChargePoint Network operates the most public charging locations in Carson with 82 sites, followed by Non-Networked with 5 sites.
How much does it cost to install an EV charger in Carson?
Level 2 EV chargers in Carson typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Carson?
Most Carson projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Carson?
A typical commercial Level 2 installation in Carson energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Carson take to become profitable?
Payback in Carson depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.