Install EV Chargers in Gardena, California

Install EV chargers or analyze a site in Gardena, California. 17 existing public charging locations (7 DC fast, 10 Level 2). Free 0–100 profitability score on any Gardena address from EV Data Map by Charge Rigs.

Gardena, California is served by 17 public electric vehicle charging locations operating 84 individual chargers — an average of 4.9 chargers per site. Of those locations, 7 (41%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (59%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Gardena is ChargePoint Network with 3 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 270 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Gardena and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Gardena

Gardena's public EV charging landscape stands out with a robust mix of 17 locations managed by 12 distinct operators, fostering a competitive environment that incentivizes pricing and uptime. Notably, 41% of these sites feature DC fast charging, with an impressive average power output of 270 kW and the fastest stall reaching 360 kW. This ultra-fast capability positions Gardena favorably in the current market, as 86% of DC fast stations operate at 150 kW or higher, catering to drivers seeking rapid charging solutions. The diversity of charging networks, led by ChargePoint at 18% of sites, encourages a nuanced approach for drivers who can choose options based on charging speed and amenities, enhancing the overall charging experience in the city.

Gardena charging by the numbers

Locations
17
Chargers
84
DC Fast locations
7
Level 2 locations
10

DC fast share: 41% of locations. Level 2 share: 59%. Average chargers per site: 4.9. Average DC fast power: 270 kW.

Gardena charging — local snapshot

Top operator share
ChargePoint Network runs 18% of public locations across 12 networks.
Average DC fast power
270 kW (fastest stall: 360 kW)
High-power share
86% of DC fast sites are 150 kW-class or higher
Mix
41% DC fast / 59% Level 2 across 17 locations
Estimated DC ports
47 fast-charging ports city-wide

Charging networks in Gardena

The following operators run public charging in Gardena, ranked by number of locations.

Featured charging locations in Gardena

A selection of higher-power public charging locations across Gardena, sorted by power level.

  1. WattEV - Gardena — Gardena, CA, 90248 (WATT_EV · DC Fast · 360 kW)
  2. Gateway Crossroads - 661 W Redondo Beach Blvd — Gardena, CA, 90247 (eVgo Network · DC Fast · 350 kW)
  3. Gardena Plaza — Gardena, CA, 90247 (eVgo Network · DC Fast · 350 kW)
  4. Target T0290 (Gardena, CA) — Gardena, CA, 90247 (Electrify America · DC Fast · 350 kW)
  5. Gateway Plaza - Tesla Supercharger — Gardena, CA, 90248 (Tesla · DC Fast · 250 kW)
  6. 19027 S Hamilton Ave — Gardena, CA, 90248 (CHARGELAB · DC Fast · 180 kW)
  7. US Bank Gardena — Gardena, CA, 90247 (EVCS · DC Fast · 50 kW)
  8. PD Parking Lot — Gardena, CA, 90247 (NOODOE · Level 2 · 11 kW)
  9. BTEC — Gardena, CA, 90248 (LOOP · Level 2 · 7.7 kW)
  10. Gardena Nissan — Gardena, CA, 90247 (Non-Networked · Level 2 · 7.2 kW)
  11. 879 W 190th St — Gardena, CA, 90248 (EV Connect · Level 2 · 7.2 kW)
  12. ENVi Mobile Car Wash - Tesla Destination — Gardena, CA, 90249 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Gardena specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Gardena, California?
There are 17 public electric vehicle charging locations in Gardena, California, with a combined 84 individual chargers. 7 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Gardena?
ChargePoint Network operates the most public charging locations in Gardena with 3 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Gardena?
Level 2 EV chargers in Gardena typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Gardena?
Most Gardena projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Gardena?
A typical commercial Level 2 installation in Gardena energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Gardena take to become profitable?
Payback in Gardena depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.