Install EV Chargers in Fontana, California

Install EV chargers or analyze a site in Fontana, California. 32 existing public charging locations (5 DC fast, 27 Level 2). Free 0–100 profitability score on any Fontana address from EV Data Map by Charge Rigs.

Fontana, California is served by 32 public electric vehicle charging locations operating 85 individual chargers — an average of 2.7 chargers per site. Of those locations, 5 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 27 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Fontana is ChargePoint Network with 25 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 62 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Fontana and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Fontana

In Fontana, California, the public EV charging landscape is heavily influenced by ChargePoint Network, which operates 78% of the city’s 32 charging locations, ensuring a consistent user experience but also reinforcing the need for alternative providers. With only 16% of these stations being DC fast chargers—averaging 62 kW and peaking at 72 kW—opportunities abound for new installations using higher-capacity equipment, as current offerings lag behind more modern standards. This could attract drivers seeking quicker turnaround times. Furthermore, with a diverse mix of Level 2 chargers catering to longer dwell times, strategically placed DC fast chargers could fill valuable gaps, enhancing the overall charging experience in Fontana.

Fontana charging by the numbers

Locations
32
Chargers
85
DC Fast locations
5
Level 2 locations
27

DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 2.7. Average DC fast power: 62 kW.

Fontana charging — local snapshot

Top operator share
ChargePoint Network runs 78% of public locations across 6 networks.
Average DC fast power
62 kW (fastest stall: 72 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 32 locations
Estimated DC ports
31 fast-charging ports city-wide

Charging networks in Fontana

The following operators run public charging in Fontana, ranked by number of locations.

Featured charging locations in Fontana

A selection of higher-power public charging locations across Fontana, sorted by power level.

  1. Falcon Ridge Town Center - Tesla Supercharger — Fontana, CA, 92336 (Tesla · DC Fast · 72 kW)
  2. FH DELIVERY 121A4 FH SVC — Fontana, CA, 92336 (ChargePoint Network · DC Fast · 62.5 kW)
  3. FH DELIVERY 123FC FH SVC — Fontana, CA, 92336 (ChargePoint Network · DC Fast · 62.5 kW)
  4. FH DELIVERY 12339 FH SVC — Fontana, CA, 92336 (ChargePoint Network · DC Fast · 62.5 kW)
  5. Fontana Ignite Fueling — Fontana, CA, 92336 (EVGATEWAY · DC Fast · 50 kW)
  6. A.B. Miller High School — Fontana, CA, 92336 (Blink Network · Level 2 · 10.8 kW)
  7. McDonalds — Fontana, CA, 92335 (Blink Network · Level 2 · 10.4 kW)
  8. 10744 Almond Ave — Fontana, CA, 92337 (LOOP · Level 2 · 7.7 kW)
  9. Fontana Community Senior Center (Reduced Charging 4-9pm) — Fontana, CA, 92335 (EV Connect · Level 2 · 7.4 kW)
  10. Ryder Fontana — Fontana, CA, 92337 (EVGATEWAY · Level 2 · 7.2 kW)
  11. FONTANA EV #1-6 STAGE RED 7 — Fontana, CA, 92335 (ChargePoint Network · Level 2 · 6.5 kW)
  12. FONTANA EV #1-6 STATION #10 — Fontana, CA, 92335 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Fontana specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 27 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Fontana, California?
There are 32 public electric vehicle charging locations in Fontana, California, with a combined 85 individual chargers. 5 locations offer DC fast charging and 27 provide Level 2 charging.
What is the largest EV charging network in Fontana?
ChargePoint Network operates the most public charging locations in Fontana with 25 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Fontana?
Level 2 EV chargers in Fontana typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Fontana?
Most Fontana projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Fontana?
A typical commercial Level 2 installation in Fontana energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Fontana take to become profitable?
Payback in Fontana depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage