Install EV chargers or analyze a site in Lake Elsinore, California. 13 existing public charging locations (10 DC fast, 3 Level 2). Free 0–100 profitability score on any Lake Elsinore address from EV Data Map by Charge Rigs.
Lake Elsinore, California is served by 13 public electric vehicle charging locations operating 64 individual chargers — an average of 4.9 chargers per site. Of those locations, 10 (77%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 3 (23%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Lake Elsinore is ChargePoint Network with 5 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 141 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lake Elsinore and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Lake Elsinore
Lake Elsinore boasts a robust and competitive EV charging ecosystem with 13 public locations, featuring a notable 77% share of DC fast chargers. The average charging power of 141 kW, combined with 30% of fast chargers exceeding 150 kW, positions the city as an attractive option for drivers prioritizing efficiency. With seven diverse charging networks, including the leading ChargePoint Network, users can choose based on power compatibility and amenities rather than brand loyalty, creating a dynamic market environment. Additionally, the presence of an impressive 54 DC fast ports enhances accessibility, catering to both short and long dwell-time needs, while the local infrastructure invites new operators to compete with high-performance offerings.
Lake Elsinore charging by the numbers
Locations
13
Chargers
64
DC Fast locations
10
Level 2 locations
3
DC fast share: 77% of locations. Level 2 share: 23%. Average chargers per site: 4.9. Average DC fast power: 141 kW.
Lake Elsinore charging — local snapshot
Top operator share
ChargePoint Network runs 38% of public locations across 7 networks.
Average DC fast power
141 kW (fastest stall: 350 kW)
High-power share
30% of DC fast sites are 150 kW-class or higher
Mix
77% DC fast / 23% Level 2 across 13 locations
Estimated DC ports
54 fast-charging ports city-wide
Charging networks in Lake Elsinore
The following operators run public charging in Lake Elsinore, ranked by number of locations.
ChargePoint Network — 5 locations
Tesla — 2 locations
Non-Networked — 2 locations
Electrify America — 1 location
EVCS — 1 location
eVgo Network — 1 location
Tesla Destination — 1 location
Featured charging locations in Lake Elsinore
A selection of higher-power public charging locations across Lake Elsinore, sorted by power level.
Walmart 2077 (Lake Elsinore, CA) — Lake Elsinore, CA, 92532 (Electrify America · DC Fast · 350 kW)
Lake Elsinore City Center - Tesla Supercharger — Lake Elsinore, CA, 92532 (Tesla · DC Fast · 250 kW)
Outlets at Lake Elsinore - Tesla Supercharger — Lake Elsinore, CA, 92530 (Tesla · DC Fast · 150 kW)
IN-N-OUT DEXTER 05 — Lake Elsinore, CA, 92532 (ChargePoint Network · DC Fast · 125 kW)
IN-N-OUT DEXTER 01 — Lake Elsinore, CA, 92532 (ChargePoint Network · DC Fast · 125 kW)
IN-N-OUT DEXTER 02 — Lake Elsinore, CA, 92532 (ChargePoint Network · DC Fast · 125 kW)
IN-N-OUT DEXTER 04 — Lake Elsinore, CA, 92532 (ChargePoint Network · DC Fast · 125 kW)
IN-N-OUT DEXTER 03 — Lake Elsinore, CA, 92532 (ChargePoint Network · DC Fast · 62 kW)
LA Fitness Lake Elsinore — Lake Elsinore, CA, 92530 (EVCS · DC Fast · 50 kW)
Outlets at Lake Elsinore — Lake Elsinore, CA, 92530 (eVgo Network · DC Fast · 50 kW)
Lake Elsinore - Storm Stadium — Lake Elsinore, CA, 92530 (Non-Networked · Level 2 · 7.2 kW)
Lake Elsinore - City Hall — Lake Elsinore, CA, 92530 (Non-Networked · Level 2 · 7.2 kW)
Nearby cities with EV charging coverage
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Lake Elsinore specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 3 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Lake Elsinore, California?
There are 13 public electric vehicle charging locations in Lake Elsinore, California, with a combined 64 individual chargers. 10 locations offer DC fast charging and 3 provide Level 2 charging.
What is the largest EV charging network in Lake Elsinore?
ChargePoint Network operates the most public charging locations in Lake Elsinore with 5 sites, followed by Tesla with 2 sites.
How much does it cost to install an EV charger in Lake Elsinore?
Level 2 EV chargers in Lake Elsinore typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lake Elsinore?
Most Lake Elsinore projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lake Elsinore?
A typical commercial Level 2 installation in Lake Elsinore energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lake Elsinore take to become profitable?
Payback in Lake Elsinore depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.