Install EV Chargers in Perris, California

Install EV chargers or analyze a site in Perris, California. 16 existing public charging locations (3 DC fast, 13 Level 2). Free 0–100 profitability score on any Perris address from EV Data Map by Charge Rigs.

Perris, California is served by 16 public electric vehicle charging locations operating 48 individual chargers — an average of 3.0 chargers per site. Of those locations, 3 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Perris is ChargePoint Network with 10 locations, followed by LOOP with 2. Average DC fast power across the city is approximately 183 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Perris and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Perris

Perris, California, offers a unique charging landscape, with a heavy reliance on the ChargePoint Network, which operates 63% of the city's 16 public charging locations. The presence of three DC fast charging sites, averaging 183 kW with a peak of 250 kW, positions the city well for efficiency, with 67% of these fast chargers qualifying as 150 kW-class or higher. This local infrastructure suggests a strategic advantage for potential operators aiming to introduce high-power equipment between 150–350 kW, as such stations would appeal to EV drivers seeking rapid charging options. Additionally, the mix of long-dwell Level 2 charging further complements the DC fast offerings, highlighting the diverse charging needs across the region.

Perris charging by the numbers

Locations
16
Chargers
48
DC Fast locations
3
Level 2 locations
13

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 3.0. Average DC fast power: 183 kW.

Perris charging — local snapshot

Top operator share
ChargePoint Network runs 63% of public locations across 6 networks.
Average DC fast power
183 kW (fastest stall: 250 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 16 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Perris

The following operators run public charging in Perris, ranked by number of locations.

Featured charging locations in Perris

A selection of higher-power public charging locations across Perris, sorted by power level.

  1. Perris Plaza - Tesla Supercharger — Perris, CA, 92571 (Tesla · DC Fast · 250 kW)
  2. CircleK - Perris, CA — Perris, CA, 92571 (CIRCLE_K · DC Fast · 180 kW)
  3. Wayfair-0102099 — Perris, CA, 92571 (EVGATEWAY · DC Fast · 120 kW)
  4. PVK SERVICE STATION 2 — Perris, CA, 92570 (ChargePoint Network · Level 2 · 12 kW)
  5. Triad Magnetics — Perris, CA, 92571 (LOOP · Level 2 · 7.7 kW)
  6. American Wire Group — Perris, CA, 92570 (LOOP · Level 2 · 7.7 kW)
  7. CITY OF PERRIS MORGAN PARK 01 — Perris, CA, 92571 (ChargePoint Network · Level 2 · 6.5 kW)
  8. Perris Gas and Mart — Perris, CA, 92570 (Blink Network · Level 2 · 6.5 kW)
  9. CITY OF PERRIS MORGAN PARK 02 — Perris, CA, 92571 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CNTYOFRIVERSIDE PERRIS SHER#1 — Perris, CA, 92570 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CITY OF PERRIS MORGAN PARK 03 — Perris, CA, 92571 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CITY OF PERRIS ARC 2 — Perris, CA, 92570 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Perris specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Perris, California?
There are 16 public electric vehicle charging locations in Perris, California, with a combined 48 individual chargers. 3 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Perris?
ChargePoint Network operates the most public charging locations in Perris with 10 sites, followed by LOOP with 2 sites.
How much does it cost to install an EV charger in Perris?
Level 2 EV chargers in Perris typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Perris?
Most Perris projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Perris?
A typical commercial Level 2 installation in Perris energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Perris take to become profitable?
Payback in Perris depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage