Install EV Chargers in Moreno Valley, California

Install EV chargers or analyze a site in Moreno Valley, California. 51 existing public charging locations (8 DC fast, 43 Level 2). Free 0–100 profitability score on any Moreno Valley address from EV Data Map by Charge Rigs.

Moreno Valley, California is served by 51 public electric vehicle charging locations operating 147 individual chargers — an average of 2.9 chargers per site. Of those locations, 8 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 43 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Moreno Valley is ChargePoint Network with 39 locations, followed by eVgo Network with 3. Average DC fast power across the city is approximately 239 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Moreno Valley and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Moreno Valley

In Moreno Valley, California, public EV charging is heavily characterized by the dominance of ChargePoint Network, which operates 76% of the city's 51 public charging locations. This reliance on a single provider ensures a consistent user experience but also presents a strategic consideration for new developers aiming to enter the market. The city boasts an impressive average DC fast charging power of 239 kW, with 75% of these sites exceeding 150 kW, making them among the most competitive in the region. Given that 16% of charging sites are fast chargers, operators targeting the higher end of the power spectrum between 150 and 350 kW could easily attract drivers prioritizing rapid charging, especially when considering optimal placement relative to demographic and traffic patterns in surrounding areas.

Moreno Valley charging by the numbers

Locations
51
Chargers
147
DC Fast locations
8
Level 2 locations
43

DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 2.9. Average DC fast power: 239 kW.

Moreno Valley charging — local snapshot

Top operator share
ChargePoint Network runs 76% of public locations across 9 networks.
Average DC fast power
239 kW (fastest stall: 350 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 51 locations
Estimated DC ports
36 fast-charging ports city-wide

Charging networks in Moreno Valley

The following operators run public charging in Moreno Valley, ranked by number of locations.

Featured charging locations in Moreno Valley

A selection of higher-power public charging locations across Moreno Valley, sorted by power level.

  1. WinCo Foods - Moreno Valley #46 — Moreno Valley, CA, 92553 (eVgo Network · DC Fast · 350 kW)
  2. The District at Moreno Valley — Moreno Valley, CA, 92557 (eVgo Network · DC Fast · 350 kW)
  3. Moreno Valley Mall — Moreno Valley, CA, 92553 (eVgo Network · DC Fast · 350 kW)
  4. ARCO - Tesla Supercharger — Moreno Valley, CA, 92553 (Tesla · DC Fast · 250 kW)
  5. PREMIERHYUNDAI STATION 1 — Moreno Valley, CA, 92555 (ChargePoint Network · DC Fast · 250 kW)
  6. PREMIERHYUNDAI STATION 2 — Moreno Valley, CA, 92555 (ChargePoint Network · DC Fast · 250 kW)
  7. CITY HALL CORPORATE YARD5 — Moreno Valley, CA, 92551 (ChargePoint Network · DC Fast · 62.5 kW)
  8. WASTE WASTE RES. 1 — Moreno Valley, CA, 92553 (ChargePoint Network · DC Fast · 50 kW)
  9. F&D Moreno Valley, CA — Moreno Valley, CA, 92557 (ENVIROSPARK · Level 2 · 11.1 kW)
  10. Ayres Hotel & Spa Moreno Valley — Moreno Valley, CA, 92553 (LOOP · Level 2 · 7.7 kW)
  11. SITE NAME EVG — Moreno Valley, CA, 92553 (EVGATEWAY · Level 2 · 7.2 kW)
  12. Ayres Hotel & Spa - Moreno Valley - Tesla Destination — Moreno Valley, CA, 92553 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Moreno Valley specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 43 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Moreno Valley, California?
There are 51 public electric vehicle charging locations in Moreno Valley, California, with a combined 147 individual chargers. 8 locations offer DC fast charging and 43 provide Level 2 charging.
What is the largest EV charging network in Moreno Valley?
ChargePoint Network operates the most public charging locations in Moreno Valley with 39 sites, followed by eVgo Network with 3 sites.
How much does it cost to install an EV charger in Moreno Valley?
Level 2 EV chargers in Moreno Valley typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Moreno Valley?
Most Moreno Valley projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Moreno Valley?
A typical commercial Level 2 installation in Moreno Valley energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Moreno Valley take to become profitable?
Payback in Moreno Valley depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.