Install EV chargers or analyze a site in Murrieta, California. 39 existing public charging locations (15 DC fast, 24 Level 2). Free 0–100 profitability score on any Murrieta address from EV Data Map by Charge Rigs.
Murrieta, California is served by 39 public electric vehicle charging locations operating 133 individual chargers — an average of 3.4 chargers per site. Of those locations, 15 (38%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 24 (62%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Murrieta is ChargePoint Network with 30 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 142 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Murrieta and receive an instant ROI score, demand projection, and recommended charger configuration.
In Murrieta, California, the public charging landscape is notably influenced by ChargePoint Network, which controls 77% of the 39 available locations, underscoring a reliance on a single operator for reliability and pricing. The city hosts 15 DC fast charging sites, averaging 142 kW, with a significant 33% classified at 150 kW or higher, making them attractive options for EV drivers seeking quick charges. With the fastest stall reaching 350 kW, new charging installations that target this power range will directly compete for driver attention in navigation apps. Additionally, the mix of 38% DC fast chargers and 62% Level 2 stations highlights a balanced approach to cater to both fast and longer-dwell needs, suggesting strategic opportunities for expanding the charging network amidst existing competition.
DC fast share: 38% of locations. Level 2 share: 62%. Average chargers per site: 3.4. Average DC fast power: 142 kW.
The following operators run public charging in Murrieta, ranked by number of locations.
A selection of higher-power public charging locations across Murrieta, sorted by power level.
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Murrieta specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 15 DC fast and 24 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.