Install EV Chargers in Santa Monica, California

Install EV chargers or analyze a site in Santa Monica, California. 240 existing public charging locations (10 DC fast, 230 Level 2). Free 0–100 profitability score on any Santa Monica address from EV Data Map by Charge Rigs.

Santa Monica, California is served by 240 public electric vehicle charging locations operating 697 individual chargers — an average of 2.9 chargers per site. Of those locations, 10 (4%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 230 (96%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Santa Monica is ChargePoint Network with 181 locations, followed by Tesla Destination with 14. Average DC fast power across the city is approximately 220 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Santa Monica and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Santa Monica

Santa Monica's EV charging landscape is notably characterized by a concentration of 239 public charging locations, with a significant reliance on the ChargePoint Network, which operates 75% of these sites. With only 4% of the locations providing DC fast charging, drivers seeking rapid charging options will find 10 fast stations averaging 220 kW, and many reaching 150 kW-class or higher, emphasizing the city's ultra-fast capabilities. This puts new charging operators in a competitive position, particularly if they can offer hardware in the 150–350 kW range, appealing to drivers prioritizing efficiency. For developers and operators, understanding Santa Monica's distinct reliance on a single dominant network and its ultra-fast charging options is crucial for navigating market entry and ensuring visibility in local navigation platforms.

Santa Monica charging by the numbers

Locations
240
Chargers
697
DC Fast locations
10
Level 2 locations
230

DC fast share: 4% of locations. Level 2 share: 96%. Average chargers per site: 2.9. Average DC fast power: 220 kW.

Santa Monica charging — local snapshot

Top operator share
ChargePoint Network runs 75% of public locations across 12 networks.
Average DC fast power
220 kW (fastest stall: 350 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
4% DC fast / 96% Level 2 across 240 locations
Estimated DC ports
156 fast-charging ports city-wide

Charging networks in Santa Monica

The following operators run public charging in Santa Monica, ranked by number of locations.

Featured charging locations in Santa Monica

A selection of higher-power public charging locations across Santa Monica, sorted by power level.

  1. Lot 29 — Santa Monica, CA, 90401 (eVgo Network · DC Fast · 350 kW)
  2. Santa Monica Station (Santa Monica, CA) — Santa Monica, CA, 90404 (Electrify America · DC Fast · 350 kW)
  3. Lot 27 — Santa Monica, CA, 90401 (eVgo Network · DC Fast · 350 kW)
  4. Chase Bank - 2701 Wilshire Blvd — Santa Monica, CA, 90403 (eVgo Network · DC Fast · 350 kW)
  5. Chevron - Tesla Supercharger — Santa Monica, CA, 90404 (Tesla · DC Fast · 250 kW)
  6. Santa Monica, CA - Tesla Supercharger — Santa Monica, CA, 90404 (Tesla · DC Fast · 250 kW)
  7. Santa Monica - Civic Center — Santa Monica, CA, 90401 (eVgo Network · DC Fast · 100 kW)
  8. Audi Santa Monica — Santa Monica, CA, 90401 (LOOP · DC Fast · 75 kW)
  9. Santa Monica Place - Tesla Supercharger — Santa Monica, CA, 90401 (Tesla · DC Fast · 72 kW)
  10. City of Santa Monica - Civic Parking Garage — Santa Monica, CA, 90401 (Non-Networked · DC Fast · 50 kW)
  11. CITY STATION AIRPORT 2 — Santa Monica, CA, 90405 (ChargePoint Network · Level 2 · 12 kW)
  12. SANTA MONICA A CIVIC EVSE 28 — Santa Monica, CA, 90401 (ChargePoint Network · Level 2 · 12 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Santa Monica specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 230 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Santa Monica, California?
There are 240 public electric vehicle charging locations in Santa Monica, California, with a combined 697 individual chargers. 10 locations offer DC fast charging and 230 provide Level 2 charging.
What is the largest EV charging network in Santa Monica?
ChargePoint Network operates the most public charging locations in Santa Monica with 181 sites, followed by Tesla Destination with 14 sites.
How much does it cost to install an EV charger in Santa Monica?
Level 2 EV chargers in Santa Monica typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Santa Monica?
Most Santa Monica projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Santa Monica?
A typical commercial Level 2 installation in Santa Monica energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Santa Monica take to become profitable?
Payback in Santa Monica depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage