Install EV chargers or analyze a site in Martinez, California. 35 existing public charging locations (3 DC fast, 32 Level 2). Free 0–100 profitability score on any Martinez address from EV Data Map by Charge Rigs.
Martinez, California is served by 35 public electric vehicle charging locations operating 64 individual chargers — an average of 1.8 chargers per site. Of those locations, 3 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 32 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Martinez is ChargePoint Network with 32 locations, followed by eVgo Network with 1. Average DC fast power across the city is approximately 217 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Martinez and receive an instant ROI score, demand projection, and recommended charger configuration.
Martinez, California, features a robust public EV charging infrastructure dominated by ChargePoint Network, which operates 91% of the city's 35 public charging locations. This reliance on a single operator ensures consistent uptime and pricing but presents considerations for new site developers. Notably, the city's three DC fast charging stations boast an impressive average power output of 217 kW, with 67% classified at 150 kW or higher, allowing for ultra-fast charging options that are attractive to EV drivers. The local mix—comprised of both 9% DC fast and primarily Level 2 charging options—indicates a notable opportunity for operators looking to enhance service in the market, particularly with a growing focus on DC fast charging capacity in navigation applications.
DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 1.8. Average DC fast power: 217 kW.
The following operators run public charging in Martinez, ranked by number of locations.
A selection of higher-power public charging locations across Martinez, sorted by power level.
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Martinez specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 32 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.