Install EV Chargers in Martinez, California

Install EV chargers or analyze a site in Martinez, California. 35 existing public charging locations (3 DC fast, 32 Level 2). Free 0–100 profitability score on any Martinez address from EV Data Map by Charge Rigs.

Martinez, California is served by 35 public electric vehicle charging locations operating 64 individual chargers — an average of 1.8 chargers per site. Of those locations, 3 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 32 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Martinez is ChargePoint Network with 32 locations, followed by eVgo Network with 1. Average DC fast power across the city is approximately 217 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Martinez and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Martinez

Martinez, California, features a robust public EV charging infrastructure dominated by ChargePoint Network, which operates 91% of the city's 35 public charging locations. This reliance on a single operator ensures consistent uptime and pricing but presents considerations for new site developers. Notably, the city's three DC fast charging stations boast an impressive average power output of 217 kW, with 67% classified at 150 kW or higher, allowing for ultra-fast charging options that are attractive to EV drivers. The local mix—comprised of both 9% DC fast and primarily Level 2 charging options—indicates a notable opportunity for operators looking to enhance service in the market, particularly with a growing focus on DC fast charging capacity in navigation applications.

Martinez charging by the numbers

Locations
35
Chargers
64
DC Fast locations
3
Level 2 locations
32

DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 1.8. Average DC fast power: 217 kW.

Martinez charging — local snapshot

Top operator share
ChargePoint Network runs 91% of public locations across 4 networks.
Average DC fast power
217 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 35 locations
Estimated DC ports
22 fast-charging ports city-wide

Charging networks in Martinez

The following operators run public charging in Martinez, ranked by number of locations.

Featured charging locations in Martinez

A selection of higher-power public charging locations across Martinez, sorted by power level.

  1. Albertsons-Safeway 0939 (Martinez, CA) — Martinez, CA, 94553 (Electrify America · DC Fast · 350 kW)
  2. Muir Station Shopping Center - Tesla Supercharger — Martinez, CA, 94553 (Tesla · DC Fast · 250 kW)
  3. Lucky — Martinez, CA, 94553 (eVgo Network · DC Fast · 50 kW)
  4. CONTRA COSTA CO SPACE 1 — Martinez, CA, 94553 (ChargePoint Network · Level 2 · 6.5 kW)
  5. CONTRA COSTA CO TWELVE — Martinez, CA, 94553 (ChargePoint Network · Level 2 · 6.5 kW)
  6. MARTINEZ CA CITY HALL 01 — Martinez, CA, 94553 (ChargePoint Network · Level 2 · 6.5 kW)
  7. CONTRA COSTA CO EIGHT — Martinez, CA, 94553 (ChargePoint Network · Level 2 · 6.5 kW)
  8. CONTRA COSTA CO SEVEN — Martinez, CA, 94553 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CONTRA COSTA CO ELEVEN — Martinez, CA, 94553 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CONTRA COSTA CO 255 GLACIER 2 — Martinez, CA, 94553 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CONTRA COSTA CO EOC - PUBLIC 2 — Martinez, CA, 94553 (ChargePoint Network · Level 2 · 6.5 kW)
  12. STATION 1 IBEW LU 302 — Martinez, CA, 94553 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Martinez specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 32 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Martinez, California?
There are 35 public electric vehicle charging locations in Martinez, California, with a combined 64 individual chargers. 3 locations offer DC fast charging and 32 provide Level 2 charging.
What is the largest EV charging network in Martinez?
ChargePoint Network operates the most public charging locations in Martinez with 32 sites, followed by eVgo Network with 1 sites.
How much does it cost to install an EV charger in Martinez?
Level 2 EV chargers in Martinez typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Martinez?
Most Martinez projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Martinez?
A typical commercial Level 2 installation in Martinez energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Martinez take to become profitable?
Payback in Martinez depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.