Install EV Chargers in Parker, Colorado

Install EV chargers or analyze a site in Parker, Colorado. 17 existing public charging locations (2 DC fast, 15 Level 2). Free 0–100 profitability score on any Parker address from EV Data Map by Charge Rigs.

Parker, Colorado is served by 17 public electric vehicle charging locations operating 44 individual chargers — an average of 2.6 chargers per site. Of those locations, 2 (12%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (88%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Parker is ChargePoint Network with 9 locations, followed by Blink Network with 5. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Parker and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Parker

Parker, Colorado boasts a competitive public charging market with 17 locations supported by 5 distinct operators, led by ChargePoint Network, which controls over half of the sites. This variety not only fosters competitive pricing but also allows drivers to choose chargers based on power and amenities rather than brand loyalty. Notably, the city features 2 DC fast charging locations averaging an impressive 250 kW, with one stall reaching 350 kW, placing Parker among the ultra-fast charging leaders in the U.S. With 12% of its charging infrastructure offering DC fast options, and the remaining Level 2 stations catering to longer-dwelling needs, Parker presents a balanced charging ecosystem designed to efficiently meet diverse EV driver requirements.

Parker charging by the numbers

Locations
17
Chargers
44
DC Fast locations
2
Level 2 locations
15

DC fast share: 12% of locations. Level 2 share: 88%. Average chargers per site: 2.6. Average DC fast power: 250 kW.

Parker charging — local snapshot

Top operator share
ChargePoint Network runs 53% of public locations across 5 networks.
Average DC fast power
250 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
12% DC fast / 88% Level 2 across 17 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Parker

The following operators run public charging in Parker, ranked by number of locations.

Featured charging locations in Parker

A selection of higher-power public charging locations across Parker, sorted by power level.

  1. Parker Crossroads Shopping Center — Parker, CO, 80134 (eVgo Network · DC Fast · 350 kW)
  2. Kroger King Soopers 126 (Parker, CO) — Parker, CO, 80134 (Electrify America · DC Fast · 150 kW)
  3. Firestone Complete Auto Care - Parker — Parker, CO, 80134 (Blink Network · Level 2 · 21.6 kW)
  4. CORE SEDALIA ADVENT_PARKER_S — Parker, CO, 80138 (ChargePoint Network · Level 2 · 19.2 kW)
  5. CORE SEDALIA ADVENT_PARKER_N — Parker, CO, 80138 (ChargePoint Network · Level 2 · 19.2 kW)
  6. CORE SEDALIA LINCOLN CREEK — Parker, CO, 80138 (ChargePoint Network · Level 2 · 19.2 kW)
  7. Parker Adventist Hospital — Parker, CO, 80138 (Non-Networked · Level 2 · 7.2 kW)
  8. CORE SEDALIA O'BRIEN PARK — Parker, CO, 80138 (ChargePoint Network · Level 2 · 6.5 kW)
  9. HYUNDAI EV SOUTH EAST 2 — Parker, CO, 80134 (ChargePoint Network · Level 2 · 6.5 kW)
  10. HYUNDAI EV NORTHWEST 1 — Parker, CO, 80134 (ChargePoint Network · Level 2 · 6.5 kW)
  11. HYUNDAI EV NORTHWEST 2 — Parker, CO, 80134 (ChargePoint Network · Level 2 · 6.5 kW)
  12. HYUNDAI EV SOUTH EAST 1 — Parker, CO, 80134 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Parker specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Parker, Colorado?
There are 17 public electric vehicle charging locations in Parker, Colorado, with a combined 44 individual chargers. 2 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in Parker?
ChargePoint Network operates the most public charging locations in Parker with 9 sites, followed by Blink Network with 5 sites.
How much does it cost to install an EV charger in Parker?
Level 2 EV chargers in Parker typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Parker?
Most Parker projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Parker?
A typical commercial Level 2 installation in Parker energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Parker take to become profitable?
Payback in Parker depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage