Install EV Chargers in Pueblo, Colorado

Install EV chargers or analyze a site in Pueblo, Colorado. 39 existing public charging locations (9 DC fast, 30 Level 2). Free 0–100 profitability score on any Pueblo address from EV Data Map by Charge Rigs.

Pueblo, Colorado is served by 39 public electric vehicle charging locations operating 83 individual chargers — an average of 2.1 chargers per site. Of those locations, 9 (23%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 30 (77%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Pueblo is ChargePoint Network with 29 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 139 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Pueblo and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Pueblo

Pueblo, Colorado features a robust public charging infrastructure, heavily dominated by ChargePoint Network, which operates 74% of the city's 39 public locations. With 9 DC fast charging sites averaging 139 kW, and 44% of those classified as 150 kW or higher, the city offers competitive charging speeds that can attract EV drivers. This concentration allows for reliable uptime but also presents challenges for new site developers who must navigate a market closely tied to a single operator. The remaining 30 Level 2 stations cater to longer-dwei demand, and a well-rounded understanding of Pueblo’s charging ecosystem, along with local traffic and demographics, can highlight opportunities for new installations to effectively meet growing needs.

Pueblo charging by the numbers

Locations
39
Chargers
83
DC Fast locations
9
Level 2 locations
30

DC fast share: 23% of locations. Level 2 share: 77%. Average chargers per site: 2.1. Average DC fast power: 139 kW.

Pueblo charging — local snapshot

Top operator share
ChargePoint Network runs 74% of public locations across 7 networks.
Average DC fast power
139 kW (fastest stall: 350 kW)
High-power share
44% of DC fast sites are 150 kW-class or higher
Mix
23% DC fast / 77% Level 2 across 39 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Pueblo

The following operators run public charging in Pueblo, ranked by number of locations.

Featured charging locations in Pueblo

A selection of higher-power public charging locations across Pueblo, sorted by power level.

  1. Sam's Club 6549 (Pueblo, CO) — Pueblo, CO, 81008 (Electrify America · DC Fast · 350 kW)
  2. Central Main St Parking Garage - Tesla Supercharger — Pueblo, CO, 81003 (Tesla · DC Fast · 250 kW)
  3. 7-ELEVEN, INC. 32990PUEBLO PL1 — Pueblo, CO, 81008 (ChargePoint Network · DC Fast · 200 kW)
  4. 7-ELEVEN, INC. 32990PUEBLO PL2 — Pueblo, CO, 81008 (ChargePoint Network · DC Fast · 200 kW)
  5. SPRADLEY CHEVY SHYUNDAI 1 — Pueblo, CO, 81008 (ChargePoint Network · DC Fast · 62.5 kW)
  6. SPRADLEY CHEVY SHYUNDAI 2 — Pueblo, CO, 81008 (ChargePoint Network · DC Fast · 62.5 kW)
  7. Sangre de Cristo Arts & Conference Center — Pueblo, CO, 81003 (Non-Networked · DC Fast · 50 kW)
  8. Dave Solon Nissan — Pueblo, CO, 81008 (Non-Networked · DC Fast · 50 kW)
  9. Sangre De Cristo Art Center — Pueblo, CO, 81003 (EVGATEWAY · DC Fast · 27 kW)
  10. Subaru of Pueblo — Pueblo, CO, 81008 (Blink Network · Level 2 · 21.6 kW)
  11. PUEBLO CC AUTO STATION #4 — Pueblo, CO, 81004 (ChargePoint Network · Level 2 · 12 kW)
  12. CDOT R2 PUEBLO 8 — Pueblo, CO, 81008 (ChargePoint Network · Level 2 · 12 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Pueblo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 30 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Pueblo, Colorado?
There are 39 public electric vehicle charging locations in Pueblo, Colorado, with a combined 83 individual chargers. 9 locations offer DC fast charging and 30 provide Level 2 charging.
What is the largest EV charging network in Pueblo?
ChargePoint Network operates the most public charging locations in Pueblo with 29 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Pueblo?
Level 2 EV chargers in Pueblo typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Pueblo?
Most Pueblo projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Pueblo?
A typical commercial Level 2 installation in Pueblo energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Pueblo take to become profitable?
Payback in Pueblo depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage