Install EV Chargers in East Lyme, Connecticut

Install EV chargers or analyze a site in East Lyme, Connecticut. 34 existing public charging locations (1 DC fast, 33 Level 2). Free 0–100 profitability score on any East Lyme address from EV Data Map by Charge Rigs.

East Lyme, Connecticut is served by 34 public electric vehicle charging locations operating 89 individual chargers — an average of 2.6 chargers per site. Of those locations, 1 (3%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 33 (97%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in East Lyme is ChargePoint Network with 29 locations, followed by AMPUP with 2. Average DC fast power across the city is approximately 180 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in East Lyme and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in East Lyme

East Lyme, Connecticut offers a unique landscape for EV charging, primarily driven by the dominance of ChargePoint Network, which operates 85% of the 34 public charging locations. With only 3% of these spots being DC fast chargers averaging 180 kW, competition for high-power options is limited, especially since all DC fast sites exceed 150 kW. This concentration provides both reliability and potential limitations for new developers, as they must consider how higher-capacity chargers in the 150–350 kW range could attract drivers through navigation apps. Moreover, the substantial presence of Level 2 chargers caters to longer dwell times, creating a diversified offering that meets different user needs in the area, while highlighting opportunities for growth.

East Lyme charging by the numbers

Locations
34
Chargers
89
DC Fast locations
1
Level 2 locations
33

DC fast share: 3% of locations. Level 2 share: 97%. Average chargers per site: 2.6. Average DC fast power: 180 kW.

East Lyme charging — local snapshot

Top operator share
ChargePoint Network runs 85% of public locations across 5 networks.
Average DC fast power
180 kW (fastest stall: 180 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
3% DC fast / 97% Level 2 across 34 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in East Lyme

The following operators run public charging in East Lyme, ranked by number of locations.

Featured charging locations in East Lyme

A selection of higher-power public charging locations across East Lyme, sorted by power level.

  1. Monaco Ford of Niantic — East Lyme, CT, 06357 (Blink Network · DC Fast · 180 kW)
  2. Camp Nett BLDG 212 — East Lyme, CT, 06357 (FLO · Level 2 · 13.3 kW)
  3. NIANTIC CHARGE 3 — East Lyme, CT, 06357 (ChargePoint Network · Level 2 · 12 kW)
  4. NIANTIC CHARGE 1 — East Lyme, CT, 06357 (ChargePoint Network · Level 2 · 12 kW)
  5. NIANTIC CHARGE 5 — East Lyme, CT, 06357 (ChargePoint Network · Level 2 · 12 kW)
  6. NIANTIC CHARGE 4 — East Lyme, CT, 06357 (ChargePoint Network · Level 2 · 12 kW)
  7. NIANTIC CHARGE 2 — East Lyme, CT, 06357 (ChargePoint Network · Level 2 · 12 kW)
  8. 1 Maple Tree — East Lyme, CT, 06333 (EVIUM · Level 2 · 7.7 kW)
  9. Noble Gas Station — East Lyme, CT, 06333 (AMPUP · Level 2 · 7.2 kW)
  10. CorePlus Federal Credit Union — East Lyme, CT, 06333 (AMPUP · Level 2 · 7.2 kW)
  11. MHA DOUGLAS 8 — East Lyme, CT, 06333 (ChargePoint Network · Level 2 · 6.5 kW)
  12. MHA DOUGLAS 3 — East Lyme, CT, 06333 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For East Lyme specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 33 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in East Lyme, Connecticut?
There are 34 public electric vehicle charging locations in East Lyme, Connecticut, with a combined 89 individual chargers. 1 locations offer DC fast charging and 33 provide Level 2 charging.
What is the largest EV charging network in East Lyme?
ChargePoint Network operates the most public charging locations in East Lyme with 29 sites, followed by AMPUP with 2 sites.
How much does it cost to install an EV charger in East Lyme?
Level 2 EV chargers in East Lyme typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in East Lyme?
Most East Lyme projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in East Lyme?
A typical commercial Level 2 installation in East Lyme energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in East Lyme take to become profitable?
Payback in East Lyme depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.