Install EV chargers or analyze a site in Old Saybrook, Connecticut. 10 existing public charging locations (1 DC fast, 9 Level 2). Free 0–100 profitability score on any Old Saybrook address from EV Data Map by Charge Rigs.

Old Saybrook, Connecticut is served by 10 public electric vehicle charging locations operating 21 individual chargers — an average of 2.1 chargers per site. Of those locations, 1 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Old Saybrook is ChargePoint Network with 2 locations, followed by LOOP with 2. Average DC fast power across the city is approximately 50 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Old Saybrook and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Old Saybrook

Old Saybrook presents a unique landscape for EV charging with its diverse mix of 10 public locations operated by 8 distinct networks, fostering competitive pricing and uptime. Notably, while the city has only one DC fast charger averaging 50 kW, this represents a legacy asset in a region increasingly focused on higher power options. The predominance of Level 2 chargers highlights a significant demand for longer dwell times, catering to local drivers. With multiple operators like ChargePoint running only 20% of venues, EV users in Old Saybrook prioritize power and amenities over brand loyalty, making the selection process more strategic. This situation creates an opportunity for future enhancements to better serve EV users navigating the area.

Old Saybrook charging by the numbers

Locations
10
Chargers
21
DC Fast locations
1
Level 2 locations
9

DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 2.1. Average DC fast power: 50 kW.

Old Saybrook charging — local snapshot

Top operator share
ChargePoint Network runs 20% of public locations across 8 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 10 locations
Estimated DC ports
1 fast-charging ports city-wide

Charging networks in Old Saybrook

The following operators run public charging in Old Saybrook, ranked by number of locations.

Featured charging locations in Old Saybrook

A selection of higher-power public charging locations across Old Saybrook, sorted by power level.

  1. Vachon Buick GMC — old saybrook, CT, 06475 (EV Connect · DC Fast · 50 kW)
  2. CHARGER111 STATION 1 — Old Saybrook, CT, 06475 (ChargePoint Network · Level 2 · 12 kW)
  3. Saybrook Ford — Old Saybrook, CT, 6475 (Blink Network · Level 2 · 8.6 kW)
  4. 366 Main Street — Old Saybrook, CT, 06475 (LOOP · Level 2 · 7.7 kW)
  5. Brodeur & Co — Old Saybrook, CT, 06475 (LOOP · Level 2 · 7.7 kW)
  6. Big Y — Old Saybrook, CT, 06475 (Non-Networked · Level 2 · 7.2 kW)
  7. ENG-000089 — Old Saybrook, CT, 06475 (WEVO · Level 2 · 7.2 kW)
  8. Saybrook Point Inn, Spa & Marina - Tesla Destination — Old Saybrook, CT, 06475 (Tesla Destination · Level 2 · 7.2 kW)
  9. MAIN STREET PAR CT4000 — Old Saybrook, CT, 06475 (ChargePoint Network · Level 2 · 6.5 kW)
  10. Old Saybrook DMV — Old Saybrook, CT, 06475 (FLO · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Old Saybrook specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Old Saybrook, Connecticut?
There are 10 public electric vehicle charging locations in Old Saybrook, Connecticut, with a combined 21 individual chargers. 1 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Old Saybrook?
ChargePoint Network operates the most public charging locations in Old Saybrook with 2 sites, followed by LOOP with 2 sites.
How much does it cost to install an EV charger in Old Saybrook?
Level 2 EV chargers in Old Saybrook typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Old Saybrook?
Most Old Saybrook projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Old Saybrook?
A typical commercial Level 2 installation in Old Saybrook energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Old Saybrook take to become profitable?
Payback in Old Saybrook depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.