Install EV Chargers in Glastonbury, Connecticut

Install EV chargers or analyze a site in Glastonbury, Connecticut. 14 existing public charging locations (3 DC fast, 11 Level 2). Free 0–100 profitability score on any Glastonbury address from EV Data Map by Charge Rigs.

Glastonbury, Connecticut is served by 14 public electric vehicle charging locations operating 36 individual chargers — an average of 2.6 chargers per site. Of those locations, 3 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Glastonbury is ChargePoint Network with 7 locations, followed by AMPUP with 2. Average DC fast power across the city is approximately 110 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Glastonbury and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Glastonbury

Glastonbury boasts a strategically diverse EV charging landscape with 14 public locations across 6 distinct networks, led by ChargePoint Network which comprises half of the sites. This variety can enhance competitiveness in pricing and uptime, giving drivers more choice based on their needs. The city's 3 DC fast charging locations, averaging 110 kW and featuring a peak stall of 180 kW, cater well to those looking for quick recharges, while 33% of these sites are 150 kW-class or higher. This mid-power fleet aligns with growing driver expectations for flexibility and speed, positioning Glastonbury favorably against neighboring communities, and emphasizing the importance of site selection based on varied power offerings and amenities.

Glastonbury charging by the numbers

Locations
14
Chargers
36
DC Fast locations
3
Level 2 locations
11

DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 2.6. Average DC fast power: 110 kW.

Glastonbury charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 6 networks.
Average DC fast power
110 kW (fastest stall: 180 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
21% DC fast / 79% Level 2 across 14 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Glastonbury

The following operators run public charging in Glastonbury, ranked by number of locations.

Featured charging locations in Glastonbury

A selection of higher-power public charging locations across Glastonbury, sorted by power level.

  1. Monaco Ford — Glastonbury, CT, 06033 (Blink Network · DC Fast · 180 kW)
  2. The Shoppes at Fox Run 1 — Glastonbury, CT, 06033 (eVgo Network · DC Fast · 100 kW)
  3. 256 Oakwood Drive Suite 3 — Glastonbury, CT, 06033 (EV Connect · DC Fast · 50 kW)
  4. GLASTONBURYEV JBW STATION 2 — Glastonbury, CT, 06033 (ChargePoint Network · Level 2 · 13.4 kW)
  5. GLASTONBURYEV RCC STATION 1 — Glastonbury, CT, 06033 (ChargePoint Network · Level 2 · 11.5 kW)
  6. GLASTONBURYEV RCC STATION 2 — Glastonbury, CT, 06033 (ChargePoint Network · Level 2 · 11.5 kW)
  7. GLASTONBURYEV STATION 2 LIB — Glastonbury, CT, 06033 (ChargePoint Network · Level 2 · 9.6 kW)
  8. GLASTONBURYEV STATION 3 LIB — Glastonbury, CT, 06033 (ChargePoint Network · Level 2 · 9.6 kW)
  9. GLASTONBURYEV STATION 1 LIB — Glastonbury, CT, 06033 (ChargePoint Network · Level 2 · 9.6 kW)
  10. Investment Capital Management Ltd — Glastonbury, CT, 06033 (AMPUP · Level 2 · 7.2 kW)
  11. 43 Western Blvd — Glastonbury, CT, 06033 (Non-Networked · Level 2 · 7.2 kW)
  12. Hub Realty — Glastonbury, CT, 06033 (AMPUP · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Glastonbury specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Glastonbury, Connecticut?
There are 14 public electric vehicle charging locations in Glastonbury, Connecticut, with a combined 36 individual chargers. 3 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Glastonbury?
ChargePoint Network operates the most public charging locations in Glastonbury with 7 sites, followed by AMPUP with 2 sites.
How much does it cost to install an EV charger in Glastonbury?
Level 2 EV chargers in Glastonbury typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Glastonbury?
Most Glastonbury projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Glastonbury?
A typical commercial Level 2 installation in Glastonbury energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Glastonbury take to become profitable?
Payback in Glastonbury depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage