Install EV Chargers in Altoona, Iowa

Install EV chargers or analyze a site in Altoona, Iowa. 17 existing public charging locations (3 DC fast, 14 Level 2). Free 0–100 profitability score on any Altoona address from EV Data Map by Charge Rigs.

Altoona, Iowa is served by 17 public electric vehicle charging locations operating 43 individual chargers — an average of 2.5 chargers per site. Of those locations, 3 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Altoona is ChargePoint Network with 13 locations, followed by CHARGELAB with 2. Average DC fast power across the city is approximately 117 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Altoona and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Altoona

Altoona, Iowa's EV charging landscape is notably shaped by ChargePoint Network, operating 76% of the city's 17 public charging sites, which underlines a critical reliance on a single operator for pricing and uptime. With 18% of these being DC fast charging locations, the average output reaches 117 kW, while a significant 67% of fast chargers are 150 kW-class or higher, positioning new entrants with higher power capabilities to attract drivers seeking quicker charging solutions. This mid-power infrastructure suggests opportunities for competitive offerings, especially as local navigation apps favor faster charging options. Additionally, the predominance of Level 2 charging options provides a solid base for longer-dwell drivers, indicating a well-rounded charging mix for diverse user needs.

Altoona charging by the numbers

Locations
17
Chargers
43
DC Fast locations
3
Level 2 locations
14

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.5. Average DC fast power: 117 kW.

Altoona charging — local snapshot

Top operator share
ChargePoint Network runs 76% of public locations across 4 networks.
Average DC fast power
117 kW (fastest stall: 150 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 17 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Altoona

The following operators run public charging in Altoona, ranked by number of locations.

Featured charging locations in Altoona

A selection of higher-power public charging locations across Altoona, sorted by power level.

  1. 1419 1st Ave N — Altoona, IA, 50009 (CHARGELAB · DC Fast · 150 kW)
  2. Kum & Go - Tesla Supercharger — Altoona, IA, 50009 (Tesla · DC Fast · 150 kW)
  3. 3590 Prairie Fire NW — Altoona, IA, 50009 (CHARGELAB · DC Fast · 50 kW)
  4. Prairie Meadows Racetrack and Casino - Tesla Destination — Altoona, IA, 50009 (Tesla Destination · Level 2 · 7.2 kW)
  5. FBSICULUS PCI 56 #3 — Altoona, IA, 50009 (ChargePoint Network · Level 2 · 6.5 kW)
  6. FBSICULUS PEMB #5 — Altoona, IA, 50009 (ChargePoint Network · Level 2 · 6.5 kW)
  7. FBSICULUS PEMB #4 — Altoona, IA, 50009 (ChargePoint Network · Level 2 · 6.5 kW)
  8. FBSICULUS PEMB #3 — Altoona, IA, 50009 (ChargePoint Network · Level 2 · 6.5 kW)
  9. FBSICULUS PCI 12 #2 — Altoona, IA, 50009 (ChargePoint Network · Level 2 · 6.5 kW)
  10. FBSICULUS PCI 3-4 #2 — Altoona, IA, 50009 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FBSICULUS PCI 3-4 #1 — Altoona, IA, 50009 (ChargePoint Network · Level 2 · 6.5 kW)
  12. FBSICULUS PCI 56 #1 — Altoona, IA, 50009 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Iowa we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Altoona specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Altoona, Iowa?
There are 17 public electric vehicle charging locations in Altoona, Iowa, with a combined 43 individual chargers. 3 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Altoona?
ChargePoint Network operates the most public charging locations in Altoona with 13 sites, followed by CHARGELAB with 2 sites.
How much does it cost to install an EV charger in Altoona?
Level 2 EV chargers in Altoona typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Altoona?
Most Altoona projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Iowa state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Altoona?
A typical commercial Level 2 installation in Altoona energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Altoona take to become profitable?
Payback in Altoona depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.