Install EV chargers or analyze a site in Cedar Rapids, Iowa. 30 existing public charging locations (4 DC fast, 26 Level 2). Free 0–100 profitability score on any Cedar Rapids address from EV Data Map by Charge Rigs.
Cedar Rapids, Iowa is served by 30 public electric vehicle charging locations operating 74 individual chargers — an average of 2.5 chargers per site. Of those locations, 4 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 26 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Cedar Rapids is ChargePoint Network with 17 locations, followed by Non-Networked with 6. Average DC fast power across the city is approximately 160 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cedar Rapids and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Cedar Rapids
Cedar Rapids boasts a competitive EV charging landscape characterized by eight distinct operators managing 30 public locations, primarily led by ChargePoint Network at 57%. This variety enables consumers to choose based on charging speed and available amenities rather than being locked into one provider. The average DC fast charging power of 160 kW, with 75% of fast stations rated 150 kW or higher, positions the city well for modern EV needs. The presence of multiple networks and a solid DC fast charging infrastructure reflects a strategic opportunity for site developers to cater to both immediate charging requirements and future demand, especially as local power dynamics and driver preferences evolve.
Cedar Rapids charging by the numbers
Locations
30
Chargers
74
DC Fast locations
4
Level 2 locations
26
DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 2.5. Average DC fast power: 160 kW.
Cedar Rapids charging — local snapshot
Top operator share
ChargePoint Network runs 57% of public locations across 8 networks.
Average DC fast power
160 kW (fastest stall: 250 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 30 locations
Estimated DC ports
14 fast-charging ports city-wide
Charging networks in Cedar Rapids
The following operators run public charging in Cedar Rapids, ranked by number of locations.
ChargePoint Network — 17 locations
Non-Networked — 6 locations
Tesla Destination — 2 locations
Blink Network — 1 location
TURNONGREEN — 1 location
EVGATEWAY — 1 location
CHARGELAB — 1 location
Tesla — 1 location
Featured charging locations in Cedar Rapids
A selection of higher-power public charging locations across Cedar Rapids, sorted by power level.
Hy-Vee Grocery Store - Tesla Supercharger — Cedar Rapids, IA, 52404 (Tesla · DC Fast · 250 kW)
McGrath Chrysler Jeep Dodge Ram — Cedar Rapids, IA, 52402 (Blink Network · DC Fast · 180 kW)
MAVERIK CEDAR RAPIDS DC — Cedar Rapids, IA, 52404 (ChargePoint Network · DC Fast · 150 kW)
Indian Creek Nature Center — Cedar Rapids, IA, 52403 (CHARGELAB · DC Fast · 60 kW)
PARK CR 10 — Cedar Rapids, IA, 52404 (ChargePoint Network · Level 2 · 19.2 kW)
PARK CR 1 — Cedar Rapids, IA, 52404 (ChargePoint Network · Level 2 · 13.4 kW)
PARK CR 6 — Cedar Rapids, IA, 52404 (ChargePoint Network · Level 2 · 13.4 kW)
PARK CR 3 — Cedar Rapids, IA, 52404 (ChargePoint Network · Level 2 · 13.4 kW)
PARK CR 2 — Cedar Rapids, IA, 52404 (ChargePoint Network · Level 2 · 13.4 kW)
PARK CR 5 — Cedar Rapids, IA, 52404 (ChargePoint Network · Level 2 · 13.4 kW)
PARK CR 11 — Cedar Rapids, IA, 52404 (ChargePoint Network · Level 2 · 13.4 kW)
PARK CR 8 — Cedar Rapids, IA, 52404 (ChargePoint Network · Level 2 · 13.4 kW)
Nearby cities with EV charging coverage
Other cities in Iowa we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Cedar Rapids specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 26 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Cedar Rapids, Iowa?
There are 30 public electric vehicle charging locations in Cedar Rapids, Iowa, with a combined 74 individual chargers. 4 locations offer DC fast charging and 26 provide Level 2 charging.
What is the largest EV charging network in Cedar Rapids?
ChargePoint Network operates the most public charging locations in Cedar Rapids with 17 sites, followed by Non-Networked with 6 sites.
How much does it cost to install an EV charger in Cedar Rapids?
Level 2 EV chargers in Cedar Rapids typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cedar Rapids?
Most Cedar Rapids projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Iowa state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cedar Rapids?
A typical commercial Level 2 installation in Cedar Rapids energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cedar Rapids take to become profitable?
Payback in Cedar Rapids depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.