Install EV Chargers in Ames, Iowa

Install EV chargers or analyze a site in Ames, Iowa. 20 existing public charging locations (5 DC fast, 15 Level 2). Free 0–100 profitability score on any Ames address from EV Data Map by Charge Rigs.

Ames, Iowa is served by 20 public electric vehicle charging locations operating 49 individual chargers — an average of 2.5 chargers per site. Of those locations, 5 (25%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (75%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Ames is ChargePoint Network with 15 locations, followed by NOODOE with 2. Average DC fast power across the city is approximately 176 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ames and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Ames

Ames, Iowa's charging infrastructure presents a unique opportunity for site developers, particularly due to the dominance of the ChargePoint Network, which operates 75% of the city's 20 public charging locations. The city boasts five DC fast charging stations with an impressive average power output of 172 kW, and 60% of these are rated at 150 kW or higher, making this network particularly appealing for EV drivers seeking efficient charging options. With 25% of public locations designated as DC fast chargers and the remainder catering to longer dwell-time Level 2 charging, there is a balanced ecosystem that addresses diverse user needs. This robust framework highlights both gaps and opportunities for new entrants to enhance the charging landscape in Ames.

Ames charging by the numbers

Locations
20
Chargers
49
DC Fast locations
5
Level 2 locations
15

DC fast share: 25% of locations. Level 2 share: 75%. Average chargers per site: 2.5. Average DC fast power: 176 kW.

Ames charging — local snapshot

Top operator share
ChargePoint Network runs 75% of public locations across 5 networks.
Average DC fast power
176 kW (fastest stall: 250 kW)
High-power share
80% of DC fast sites are 150 kW-class or higher
Mix
25% DC fast / 75% Level 2 across 20 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Ames

The following operators run public charging in Ames, ranked by number of locations.

Featured charging locations in Ames

A selection of higher-power public charging locations across Ames, sorted by power level.

  1. Kwik Star #1158 - Tesla Supercharger — Ames, IA, 50010 (Tesla · DC Fast · 250 kW)
  2. AMES EV DC1 — Ames, IA, 50010 (ChargePoint Network · DC Fast · 205 kW)
  3. DeYarman CDJR Ames — Ames, IA, 50010 (Blink Network · DC Fast · 180 kW)
  4. Ames Ford Lincoln — Ames, IA, 50010 (EV Connect · DC Fast · 180 kW)
  5. AMES EV DC2 — Ames, IA, 50010 (ChargePoint Network · DC Fast · 62.5 kW)
  6. STORY CO CNSRVN CONSERVATION — Ames, IA, 50010 (ChargePoint Network · Level 2 · 9.6 kW)
  7. TRAN SERV ISU 01 — Ames, IA, 50011 (ChargePoint Network · Level 2 · 9.6 kW)
  8. Courtyard-Ames — Ames, IA, 50010 (NOODOE · Level 2 · 7 kW)
  9. Courtyard by Marriott — Ames, IA, 50010 (NOODOE · Level 2 · 7 kW)
  10. DIGITAL AG STATION 1 — Ames, IA, 50010 (ChargePoint Network · Level 2 · 6.5 kW)
  11. AMES EV LIBRARY — Ames, IA, 50010 (ChargePoint Network · Level 2 · 6.5 kW)
  12. AMES EV W LINCOLN WAY — Ames, IA, 50014 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Iowa we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Ames specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Ames, Iowa?
There are 20 public electric vehicle charging locations in Ames, Iowa, with a combined 49 individual chargers. 5 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in Ames?
ChargePoint Network operates the most public charging locations in Ames with 15 sites, followed by NOODOE with 2 sites.
How much does it cost to install an EV charger in Ames?
Level 2 EV chargers in Ames typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Ames?
Most Ames projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Iowa state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Ames?
A typical commercial Level 2 installation in Ames energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Ames take to become profitable?
Payback in Ames depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage