Install EV chargers or analyze a site in Waukee, Iowa. 11 existing public charging locations (3 DC fast, 8 Level 2). Free 0–100 profitability score on any Waukee address from EV Data Map by Charge Rigs.
Waukee, Iowa is served by 11 public electric vehicle charging locations operating 27 individual chargers — an average of 2.5 chargers per site. Of those locations, 3 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Waukee is ChargePoint Network with 8 locations, followed by RED_E with 1. Average DC fast power across the city is approximately 173 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Waukee and receive an instant ROI score, demand projection, and recommended charger configuration.
Waukee, Iowa's electric vehicle charging landscape is characterized by a significant reliance on ChargePoint Network, which operates 73% of its 11 public charging locations. This concentration not only ensures consistent service but also emphasizes the need for potential site developers to consider the dominance of a single operator. The three DC fast charging stations offer impressive average power capabilities of 173 kW, with one stall reaching up to 350 kW, positioning Waukee's charging infrastructure competitively. Notably, 33% of the DC fast chargers exceed 150 kW, crucial for attracting drivers prioritizing high-speed refueling options. With a strategic mix of fast and Level 2 chargers, Waukee presents an evolving market for new entrants looking to capture diverse charging demands.
DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 2.5. Average DC fast power: 173 kW.
The following operators run public charging in Waukee, ranked by number of locations.
A selection of higher-power public charging locations across Waukee, sorted by power level.
Other cities in Iowa we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Waukee specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.