Install EV Chargers in Ankeny, Iowa

Install EV chargers or analyze a site in Ankeny, Iowa. 10 existing public charging locations (5 DC fast, 5 Level 2). Free 0–100 profitability score on any Ankeny address from EV Data Map by Charge Rigs.

Ankeny, Iowa is served by 10 public electric vehicle charging locations operating 24 individual chargers — an average of 2.4 chargers per site. Of those locations, 5 (50%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Ankeny is ChargePoint Network with 4 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 144 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ankeny and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Ankeny

Ankeny runs a comparatively competitive public charging market: 6 distinct operators share its 10 locations, with ChargePoint Network the largest at 40% of sites. That diversity tends to keep pricing and uptime competitive but also makes corridor-style site selection more nuanced — drivers in Ankeny pick on power and amenity rather than defaulting to a single brand. The 5 DC fast locations average 144 kW, with the fastest site at 180 kW. That is a mid-power fleet by current US standards; 60% of DC fast sites are 150 kW-class or higher. New entrants pricing around 150–350 kW hardware will sit at the top of the local power curve, which matters for driver selection in nav apps. By mix, 50% of Ankeny's public locations are DC fast and the rest serve longer-dwell Level 2 demand, with roughly 14 DC fast ports across the city. EV Data Map scores any Ankeny address against this footprint and the surrounding traffic, demographics and grid context to surface the gaps worth filling first.

Ankeny charging by the numbers

Locations
10
Chargers
24
DC Fast locations
5
Level 2 locations
5

DC fast share: 50% of locations. Level 2 share: 50%. Average chargers per site: 2.4. Average DC fast power: 144 kW.

Ankeny charging — local snapshot

Top operator share
ChargePoint Network runs 40% of public locations across 6 networks.
Average DC fast power
144 kW (fastest stall: 180 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
50% DC fast / 50% Level 2 across 10 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Ankeny

The following operators run public charging in Ankeny, ranked by number of locations.

Featured charging locations in Ankeny

A selection of higher-power public charging locations across Ankeny, sorted by power level.

  1. Karl Chevrolet Ankeny IA — Ankeny, IA, 50021 (RED_E · DC Fast · 180 kW)
  2. Casey's General — Ankeny, IA, 50021 (Non-Networked · DC Fast · 150 kW)
  3. Ankeny Iowa — Ankeny, IA, 50021 (CHARGELAB · DC Fast · 150 kW)
  4. DEWEY FORD POWER LINK 2 — Ankeny, IA, 50021 (ChargePoint Network · DC Fast · 120 kW)
  5. DEWEY FORD POWERLINK 1 — Ankeny, IA, 50021 (ChargePoint Network · DC Fast · 120 kW)
  6. Home2 Suites by Hilton Ankeny — Ankeny, IA, 50021 (Blink Network · Level 2 · 10.4 kW)
  7. Dewey Ford — Ankeny, IA, 50021 (Non-Networked · Level 2 · 7.2 kW)
  8. Ankeny Best Western Premier - Tesla Destination — Ankeny, IA, 50021 (Tesla Destination · Level 2 · 7.2 kW)
  9. HY VEE ANKENY 2 EAST — Ankeny, IA, 50023 (ChargePoint Network · Level 2 · 6.5 kW)
  10. HY VEE ANKENY 2 WEST — Ankeny, IA, 50023 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Iowa we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Ankeny specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 5 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Ankeny, Iowa?
There are 10 public electric vehicle charging locations in Ankeny, Iowa, with a combined 24 individual chargers. 5 locations offer DC fast charging and 5 provide Level 2 charging.
What is the largest EV charging network in Ankeny?
ChargePoint Network operates the most public charging locations in Ankeny with 4 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Ankeny?
Level 2 EV chargers in Ankeny typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Ankeny?
Most Ankeny projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Iowa state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Ankeny?
A typical commercial Level 2 installation in Ankeny energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Ankeny take to become profitable?
Payback in Ankeny depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.