Install EV Chargers in Bettendorf, Iowa

Install EV chargers or analyze a site in Bettendorf, Iowa. 10 existing public charging locations (4 DC fast, 6 Level 2). Free 0–100 profitability score on any Bettendorf address from EV Data Map by Charge Rigs.

Bettendorf, Iowa is served by 10 public electric vehicle charging locations operating 35 individual chargers — an average of 3.5 chargers per site. Of those locations, 4 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bettendorf is ChargePoint Network with 6 locations, followed by Tesla Destination with 3. Average DC fast power across the city is approximately 153 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Bettendorf and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Bettendorf

Bettendorf, Iowa stands out in the EV charging landscape due to its concentrated reliance on the ChargePoint Network, which manages 60% of its 10 public charging locations, ensuring high reliability and consistent pricing for users. The city boasts a robust offering of DC fast charging options, with an impressive average power of 153 kW across these four locations and a maximum stall capability of 250 kW, appealing to the growing demand for rapid charging solutions. Notably, 25% of the DC fast chargers serve at 150 kW or higher, setting a competitive benchmark for any new operators looking to establish a presence. With a charging infrastructure that integrates both fast and Level 2 options, Bettendorf presents a strategic opportunity for developers targeting a modern EV landscape.

Bettendorf charging by the numbers

Locations
10
Chargers
35
DC Fast locations
4
Level 2 locations
6

DC fast share: 40% of locations. Level 2 share: 60%. Average chargers per site: 3.5. Average DC fast power: 153 kW.

Bettendorf charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 3 networks.
Average DC fast power
153 kW (fastest stall: 250 kW)
High-power share
25% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 10 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Bettendorf

The following operators run public charging in Bettendorf, ranked by number of locations.

Featured charging locations in Bettendorf

A selection of higher-power public charging locations across Bettendorf, sorted by power level.

  1. TBK Bank Sports Complex - Tesla Supercharger — Bettendorf, IA, 52722 (Tesla · DC Fast · 250 kW)
  2. LINDQUISTFORD FC 2 — Bettendorf, IA, 52722 (ChargePoint Network · DC Fast · 120 kW)
  3. LINDQUISTFORD FC 1 — Bettendorf, IA, 52722 (ChargePoint Network · DC Fast · 120 kW)
  4. LINDQUISTFORD FC 3 — Bettendorf, IA, 52722 (ChargePoint Network · DC Fast · 120 kW)
  5. LINDQUISTFORD BLOCK 2 — Bettendorf, IA, 52722 (ChargePoint Network · Level 2 · 19.2 kW)
  6. LINDQUISTFORD BLOCK 1 — Bettendorf, IA, 52722 (ChargePoint Network · Level 2 · 19.2 kW)
  7. LINDQUISTFORD BLOCK 3 — Bettendorf, IA, 52722 (ChargePoint Network · Level 2 · 19.2 kW)
  8. Courtyard Bettendorf - Tesla Destination — Bettendorf, IA, 52722 (Tesla Destination · Level 2 · 11 kW)
  9. Home2 Suites by Hilton Bettendorf Quad Cities - Tesla Destination — Bettendorf, IA, 52722 (Tesla Destination · Level 2 · 11 kW)
  10. Teriyaki Madness - Tesla Destination — Bettendorf, IA, 52722 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Iowa we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bettendorf specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bettendorf, Iowa?
There are 10 public electric vehicle charging locations in Bettendorf, Iowa, with a combined 35 individual chargers. 4 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Bettendorf?
ChargePoint Network operates the most public charging locations in Bettendorf with 6 sites, followed by Tesla Destination with 3 sites.
How much does it cost to install an EV charger in Bettendorf?
Level 2 EV chargers in Bettendorf typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Bettendorf?
Most Bettendorf projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Iowa state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Bettendorf?
A typical commercial Level 2 installation in Bettendorf energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Bettendorf take to become profitable?
Payback in Bettendorf depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.