Install EV Chargers in Coralville, Iowa

Install EV chargers or analyze a site in Coralville, Iowa. 13 existing public charging locations (3 DC fast, 10 Level 2). Free 0–100 profitability score on any Coralville address from EV Data Map by Charge Rigs.

Coralville, Iowa is served by 13 public electric vehicle charging locations operating 26 individual chargers — an average of 2.0 chargers per site. Of those locations, 3 (23%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (77%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Coralville is ChargePoint Network with 10 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 217 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Coralville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Coralville

Coralville, Iowa, presents a compelling opportunity for EV charging site developers, anchored by a concentrated offering of 13 public charging locations dominated by ChargePoint Network, which oversees 77% of these sites. With 100% of the three DC fast chargers rated at 150 kW or higher and an impressive average power of 217 kW, the local fast charging infrastructure stands out for its efficiency and speed, essential factors in driver decisions. The strategic mix includes both ultra-fast DC fast options and Level 2 chargers, catering to diverse user needs. Given this robust backdrop, new entrants aiming for 150–350 kW hardware will find themselves positioned to leverage Coralville’s competitive edge in the regional charging landscape.

Coralville charging by the numbers

Locations
13
Chargers
26
DC Fast locations
3
Level 2 locations
10

DC fast share: 23% of locations. Level 2 share: 77%. Average chargers per site: 2.0. Average DC fast power: 217 kW.

Coralville charging — local snapshot

Top operator share
ChargePoint Network runs 77% of public locations across 4 networks.
Average DC fast power
217 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
23% DC fast / 77% Level 2 across 13 locations
Estimated DC ports
10 fast-charging ports city-wide

Charging networks in Coralville

The following operators run public charging in Coralville, ranked by number of locations.

Featured charging locations in Coralville

A selection of higher-power public charging locations across Coralville, sorted by power level.

  1. MAVERIK CORALVILLE DC2 — Coralville, IA, 52241 (ChargePoint Network · DC Fast · 250 kW)
  2. MAVERIK CORALVILLE DC1 — Coralville, IA, 52241 (ChargePoint Network · DC Fast · 250 kW)
  3. Hy-Vee - Tesla Supercharger — Coralville, IA, 52241 (Tesla · DC Fast · 150 kW)
  4. Holiday Inn Coralville — Coralville, IA, 52241 (TURNONGREEN · Level 2 · 11 kW)
  5. Hawkeye Hotels Corporate Headquarters — Coralville, IA, 52241 (Non-Networked · Level 2 · 7.2 kW)
  6. IRL WEST RAMP QUARRY RD L1 #1 — Coralville, IA, 52241 (ChargePoint Network · Level 2 · 6.5 kW)
  7. IRL WEST RAMP QUARRY RD L1 #2 — Coralville, IA, 52241 (ChargePoint Network · Level 2 · 6.5 kW)
  8. HY VEE CRLVLLE 2 NORTH — Coralville, IA, 52241 (ChargePoint Network · Level 2 · 6.5 kW)
  9. IRL PARKVIEW IRL PARKVIEW — Coralville, IA, 52241 (ChargePoint Network · Level 2 · 6.5 kW)
  10. IRL WEST RAMP QUARRY RD L3 #1 — Coralville, IA, 52241 (ChargePoint Network · Level 2 · 6.5 kW)
  11. IRL WEST RAMP QUARRY RD L2 #1 — Coralville, IA, 52241 (ChargePoint Network · Level 2 · 6.5 kW)
  12. HY VEE CRLVLLE 2 SOUTH — Coralville, IA, 52241 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Iowa we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Coralville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Coralville, Iowa?
There are 13 public electric vehicle charging locations in Coralville, Iowa, with a combined 26 individual chargers. 3 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Coralville?
ChargePoint Network operates the most public charging locations in Coralville with 10 sites, followed by Non-Networked with 1 sites.
How much does it cost to install an EV charger in Coralville?
Level 2 EV chargers in Coralville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Coralville?
Most Coralville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Iowa state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Coralville?
A typical commercial Level 2 installation in Coralville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Coralville take to become profitable?
Payback in Coralville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.