Install EV Chargers in Sioux City, Iowa

Install EV chargers or analyze a site in Sioux City, Iowa. 11 existing public charging locations (7 DC fast, 4 Level 2). Free 0–100 profitability score on any Sioux City address from EV Data Map by Charge Rigs.

Sioux City, Iowa is served by 11 public electric vehicle charging locations operating 37 individual chargers — an average of 3.4 chargers per site. Of those locations, 7 (64%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (36%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Sioux City is ChargePoint Network with 6 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 208 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Sioux City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Sioux City

Sioux City boasts a competitive and diverse EV charging landscape with 11 public locations, including an impressive seven DC fast charging sites that average 208 kW—well above the national standard. The presence of six different charging networks, led by ChargePoint Network which operates 55% of the sites, ensures competitive pricing and uptime, allowing drivers to choose their preferred options based on power and amenities instead of being limited to a single operator. With 86% of DC fast stations at 150 kW or more and the fastest at 350 kW, Sioux City's infrastructure caters to both rapid charging needs and longer dwell time, making it an attractive destination for EV users navigating the region.

Sioux City charging by the numbers

Locations
11
Chargers
37
DC Fast locations
7
Level 2 locations
4

DC fast share: 64% of locations. Level 2 share: 36%. Average chargers per site: 3.4. Average DC fast power: 208 kW.

Sioux City charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 6 networks.
Average DC fast power
208 kW (fastest stall: 350 kW)
High-power share
86% of DC fast sites are 150 kW-class or higher
Mix
64% DC fast / 36% Level 2 across 11 locations
Estimated DC ports
30 fast-charging ports city-wide

Charging networks in Sioux City

The following operators run public charging in Sioux City, ranked by number of locations.

Featured charging locations in Sioux City

A selection of higher-power public charging locations across Sioux City, sorted by power level.

  1. Fareway Store #022 (Sioux City, IA) — Sioux City, IA, 51109 (Electrify America · DC Fast · 350 kW)
  2. HYUNDAI STORE HYUNDAI N — Sioux City, IA, 51106 (ChargePoint Network · DC Fast · 250 kW)
  3. Casey's General Store - Tesla Supercharger — Sioux City, IA, 51106 (Tesla · DC Fast · 250 kW)
  4. HYUNDAI STORE HYUNDAI S — Sioux City, IA, 51106 (ChargePoint Network · DC Fast · 250 kW)
  5. Sioux City Ford — Sioux City, IA, 51106 (EV Connect · DC Fast · 180 kW)
  6. 1005 Gordon Dr — Sioux City, IA, 51101 (CHARGELAB · DC Fast · 150 kW)
  7. SCKIA SCKIA 1 ABB — Sioux City, IA, 51106 (ChargePoint Network · DC Fast · 24 kW)
  8. MLK PARK RAMP LEVEL 2 — Sioux City, IA, 51101 (ChargePoint Network · Level 2 · 19.2 kW)
  9. Billion Auto Nissan Sioux City — Sioux City, IA, 51106 (Non-Networked · Level 2 · 7.2 kW)
  10. HY VEE SIOUX CITY — Sioux City, IA, 51104 (ChargePoint Network · Level 2 · 6.5 kW)
  11. AIRPORT STATION AIRPORT — Sioux City, IA, 51111 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Iowa we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Sioux City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 4 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Sioux City, Iowa?
There are 11 public electric vehicle charging locations in Sioux City, Iowa, with a combined 37 individual chargers. 7 locations offer DC fast charging and 4 provide Level 2 charging.
What is the largest EV charging network in Sioux City?
ChargePoint Network operates the most public charging locations in Sioux City with 6 sites, followed by Non-Networked with 1 sites.
How much does it cost to install an EV charger in Sioux City?
Level 2 EV chargers in Sioux City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Sioux City?
Most Sioux City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Iowa state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Sioux City?
A typical commercial Level 2 installation in Sioux City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Sioux City take to become profitable?
Payback in Sioux City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.