Install EV Chargers in Amherst, Massachusetts

Install EV chargers or analyze a site in Amherst, Massachusetts. 51 existing public charging locations (3 DC fast, 48 Level 2). Free 0–100 profitability score on any Amherst address from EV Data Map by Charge Rigs.

Amherst, Massachusetts is served by 51 public electric vehicle charging locations operating 106 individual chargers — an average of 2.1 chargers per site. Of those locations, 3 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 48 (94%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Amherst is ChargePoint Network with 49 locations, followed by SWTCH with 2. Average DC fast power across the city is approximately 104 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Amherst and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Amherst

Amherst, Massachusetts presents a unique landscape for EV charging, primarily dominated by ChargePoint Network, which operates 96% of the city's 51 public charging locations. With only 3 DC fast chargers constituting just 6% of the total, the focus remains largely on Level 2 charging, catering to longer dwell times. The average power output of the DC fast chargers is 104 kW, reaching a maximum of 125 kW, which positions them on the lower end of the current power scale. Consequently, prospective developers might consider the opportunity to introduce higher-capacity 150-350 kW chargers to attract drivers navigating local navigation apps. As the EV ecosystem continues to evolve, understanding the local charging dynamics will be crucial for successful site planning in Amherst.

Amherst charging by the numbers

Locations
51
Chargers
106
DC Fast locations
3
Level 2 locations
48

DC fast share: 6% of locations. Level 2 share: 94%. Average chargers per site: 2.1. Average DC fast power: 104 kW.

Amherst charging — local snapshot

Top operator share
ChargePoint Network runs 96% of public locations across 2 networks.
Average DC fast power
104 kW (fastest stall: 125 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
6% DC fast / 94% Level 2 across 51 locations
Estimated DC ports
3 fast-charging ports city-wide

Charging networks in Amherst

The following operators run public charging in Amherst, ranked by number of locations.

Featured charging locations in Amherst

A selection of higher-power public charging locations across Amherst, sorted by power level.

  1. AMHERST PUBLIC LOT 1 — Amherst, MA, 01002 (ChargePoint Network · DC Fast · 125 kW)
  2. AMHERST PUBLIC LOT 2 — Amherst, MA, 01002 (ChargePoint Network · DC Fast · 125 kW)
  3. UMASS AMHERST ROBSHAM DC L3 — Amherst, MA, 01003 (ChargePoint Network · DC Fast · 62.5 kW)
  4. HITCHCOCK CENT. 2-RIGHT — Amherst, MA, 01002 (ChargePoint Network · Level 2 · 13.4 kW)
  5. HITCHCOCK CENT. 1-LEFT — Amherst, MA, 01002 (ChargePoint Network · Level 2 · 13.4 kW)
  6. SWTCH Energy Inc. — Amherst, MA, 01002 (SWTCH · Level 2 · 6.6 kW)
  7. SWTCH Energy — Amherst, MA, 01002 (SWTCH · Level 2 · 6.6 kW)
  8. UMASS AMHERST VISITOR CTR L21 — Amherst, MA, 01003 (ChargePoint Network · Level 2 · 6.5 kW)
  9. AMHERST COLLEGE GROSVENOR LOT — Amherst, MA, 01002 (ChargePoint Network · Level 2 · 6.5 kW)
  10. UMASS AMHERST VISITOR CTR L23 — Amherst, MA, 01002 (ChargePoint Network · Level 2 · 6.5 kW)
  11. UMASS AMHERST UMASS LOT 41 R2 — Amherst, MA, 01003 (ChargePoint Network · Level 2 · 6.5 kW)
  12. AMHERST COLLEGE SCI. CTR LOT-#1 — Amherst, MA, 01002 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Amherst specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 48 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Amherst, Massachusetts?
There are 51 public electric vehicle charging locations in Amherst, Massachusetts, with a combined 106 individual chargers. 3 locations offer DC fast charging and 48 provide Level 2 charging.
What is the largest EV charging network in Amherst?
ChargePoint Network operates the most public charging locations in Amherst with 49 sites, followed by SWTCH with 2 sites.
How much does it cost to install an EV charger in Amherst?
Level 2 EV chargers in Amherst typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Amherst?
Most Amherst projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Amherst?
A typical commercial Level 2 installation in Amherst energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Amherst take to become profitable?
Payback in Amherst depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage