Install EV Chargers in Billerica, Massachusetts

Install EV chargers or analyze a site in Billerica, Massachusetts. 10 existing public charging locations (4 DC fast, 6 Level 2). Free 0–100 profitability score on any Billerica address from EV Data Map by Charge Rigs.

Billerica, Massachusetts is served by 10 public electric vehicle charging locations operating 10 individual chargers — an average of 1.0 chargers per site. Of those locations, 4 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Billerica is ChargePoint Network with 10 locations. Average DC fast power across the city is approximately 156 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Billerica and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Billerica

Billerica, Massachusetts, features a concentrated public charging network, entirely managed by ChargePoint Network across its 10 locations, which provides not only reliability but also a unified pricing structure for users. Notably, 40% of these sites are equipped with DC fast charging, averaging a robust 156 kW, and include several high-capacity options, such as the fastest stall at 250 kW. This modern infrastructure caters to both immediate charging needs with fast options and longer-term parking with Level 2 chargers. For site developers, recognizing the predominance of ChargePoint emphasizes the importance of competitive pricing and advanced hardware to attract EV drivers in this well-served market.

Billerica charging by the numbers

Locations
10
Chargers
10
DC Fast locations
4
Level 2 locations
6

DC fast share: 40% of locations. Level 2 share: 60%. Average chargers per site: 1.0. Average DC fast power: 156 kW.

Billerica charging — local snapshot

Top operator share
ChargePoint Network runs 100% of public locations.
Average DC fast power
156 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 10 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Billerica

The following operators run public charging in Billerica, ranked by number of locations.

Featured charging locations in Billerica

A selection of higher-power public charging locations across Billerica, sorted by power level.

  1. CHELMSFORD FORUM 1 — Billerica, MA, 01824 (ChargePoint Network · DC Fast · 250 kW)
  2. CHELMSFORD FORUM 2 — Billerica, MA, 01824 (ChargePoint Network · DC Fast · 250 kW)
  3. METTLER TOLEDO EV CHARGER #2 — Billerica, MA, 01821 (ChargePoint Network · DC Fast · 62 kW)
  4. METTLER TOLEDO EV CHARGER #1 — Billerica, MA, 01821 (ChargePoint Network · DC Fast · 62 kW)
  5. THE VAL RETAIL PARKING — Billerica, MA, 01821 (ChargePoint Network · Level 2 · 6.5 kW)
  6. THE VAL LLG #2 — Billerica, MA, 01821 (ChargePoint Network · Level 2 · 6.5 kW)
  7. THE VAL FUTURE RESIDENT — Billerica, MA, 01821 (ChargePoint Network · Level 2 · 6.5 kW)
  8. THE VAL LLG #1 — Billerica, MA, 01821 (ChargePoint Network · Level 2 · 6.5 kW)
  9. THE VAL ULG #1 — Billerica, MA, 01821 (ChargePoint Network · Level 2 · 6.5 kW)
  10. THE VAL ULG #2 — Billerica, MA, 01821 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Billerica specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Billerica, Massachusetts?
There are 10 public electric vehicle charging locations in Billerica, Massachusetts, with a combined 10 individual chargers. 4 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Billerica?
ChargePoint Network operates the most public charging locations in Billerica with 10 sites.
How much does it cost to install an EV charger in Billerica?
Level 2 EV chargers in Billerica typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Billerica?
Most Billerica projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Billerica?
A typical commercial Level 2 installation in Billerica energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Billerica take to become profitable?
Payback in Billerica depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage