Install EV Chargers in Chelmsford, Massachusetts

Install EV chargers or analyze a site in Chelmsford, Massachusetts. 25 existing public charging locations (4 DC fast, 21 Level 2). Free 0–100 profitability score on any Chelmsford address from EV Data Map by Charge Rigs.

Chelmsford, Massachusetts is served by 25 public electric vehicle charging locations operating 62 individual chargers — an average of 2.5 chargers per site. Of those locations, 4 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 21 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Chelmsford is ChargePoint Network with 20 locations, followed by RED_E with 4. Average DC fast power across the city is approximately 120 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Chelmsford and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Chelmsford

In Chelmsford, Massachusetts, public EV charging is significantly influenced by ChargePoint Network, which operates 80% of the city’s 25 charging locations, marrying reliability with a potential drawback in operator diversity. The infrastructure includes four DC fast charging sites averaging 120 kW, with the highest stall reaching 121 kW, positioning Chelmsford in the mid-power range for fast charging capabilities. Notably, none of these fast chargers exceed 150 kW class, leaving a critical gap for future operators to harness the demand for higher power options. With 84% of charging stations being Level 2, there's a clear opportunity for new entrants to fill the local demand for faster charging solutions, particularly as drivers increasingly seek quicker turnaround times.

Chelmsford charging by the numbers

Locations
25
Chargers
62
DC Fast locations
4
Level 2 locations
21

DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 2.5. Average DC fast power: 120 kW.

Chelmsford charging — local snapshot

Top operator share
ChargePoint Network runs 80% of public locations across 3 networks.
Average DC fast power
120 kW (fastest stall: 121 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 25 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Chelmsford

The following operators run public charging in Chelmsford, ranked by number of locations.

Featured charging locations in Chelmsford

A selection of higher-power public charging locations across Chelmsford, sorted by power level.

  1. Roberts Field Town of Chelmsford — Chelmsford, MA, 01824 (RED_E · DC Fast · 121 kW)
  2. Chelmsford Mobil Mart — Chelmsford, MA, 01824 (RED_E · DC Fast · 120 kW)
  3. Adams Library — Chelmsford, MA, 01824 (RED_E · DC Fast · 120 kW)
  4. Chelmsford Town Hall — Chelmsford, MA, 01824 (RED_E · DC Fast · 120 kW)
  5. 2 Omni Way — Chelmsford, MA, 01824 (LOOP · Level 2 · 7.7 kW)
  6. GRIST MILL GRIST MILL 1 — Chelmsford, MA, 01824 (ChargePoint Network · Level 2 · 6.5 kW)
  7. DELANEY TERRACE DELANEY # 3 — Chelmsford, MA, 01863 (ChargePoint Network · Level 2 · 6.5 kW)
  8. DELANEY TERRACE DELANEY # 2 — Chelmsford, MA, 01863 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CHELMSFORD HIGH SCHOOL 2 — Chelmsford, MA, 01863 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CHELMSFORD DPW 1 — Chelmsford, MA, 01824 (ChargePoint Network · Level 2 · 6.5 kW)
  11. DELANEY TERRACE DELANEY #1 — Chelmsford, MA, 01863 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CHELMSFORD 19-21 ALPHA #1 — Chelmsford, MA, 01824 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Chelmsford specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 21 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Chelmsford, Massachusetts?
There are 25 public electric vehicle charging locations in Chelmsford, Massachusetts, with a combined 62 individual chargers. 4 locations offer DC fast charging and 21 provide Level 2 charging.
What is the largest EV charging network in Chelmsford?
ChargePoint Network operates the most public charging locations in Chelmsford with 20 sites, followed by RED_E with 4 sites.
How much does it cost to install an EV charger in Chelmsford?
Level 2 EV chargers in Chelmsford typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Chelmsford?
Most Chelmsford projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Chelmsford?
A typical commercial Level 2 installation in Chelmsford energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Chelmsford take to become profitable?
Payback in Chelmsford depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage