Install EV Chargers in Tewksbury, Massachusetts

Install EV chargers or analyze a site in Tewksbury, Massachusetts. 15 existing public charging locations (4 DC fast, 11 Level 2). Free 0–100 profitability score on any Tewksbury address from EV Data Map by Charge Rigs.

Tewksbury, Massachusetts is served by 15 public electric vehicle charging locations operating 50 individual chargers — an average of 3.3 chargers per site. Of those locations, 4 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Tewksbury is ChargePoint Network with 10 locations, followed by Electrify America with 1. Average DC fast power across the city is approximately 188 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Tewksbury and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Tewksbury

In Tewksbury, Massachusetts, the EV charging landscape is notably shaped by the dominance of ChargePoint Network, which operates 67% of the city's 15 public charging locations. This concentration allows for heightened reliability while also presenting challenges for competitive operators considering entry into the market. The four DC fast charging stations boast an impressive average power of 188 kW, with half of them rated at 150 kW or higher, ensuring quick turnaround for drivers. With about 24 DC fast ports available and 27% of all public stations classified as fast chargers, Tewksbury offers a compelling mix of rapid and longer-dwell Level 2 options, creating significant opportunities for developers to identify strategic gaps in neighboring areas like Andover and Lowell.

Tewksbury charging by the numbers

Locations
15
Chargers
50
DC Fast locations
4
Level 2 locations
11

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 3.3. Average DC fast power: 188 kW.

Tewksbury charging — local snapshot

Top operator share
ChargePoint Network runs 67% of public locations across 6 networks.
Average DC fast power
188 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 15 locations
Estimated DC ports
24 fast-charging ports city-wide

Charging networks in Tewksbury

The following operators run public charging in Tewksbury, ranked by number of locations.

Featured charging locations in Tewksbury

A selection of higher-power public charging locations across Tewksbury, sorted by power level.

  1. Walmart 2222 (Tewksbury, MA) — Tewksbury, MA, 01876 (Electrify America · DC Fast · 350 kW)
  2. Fairfield Inn - Tewksbury — Tewksbury, MA, 01876 (CHARGESMART_EV · DC Fast · 240 kW)
  3. Keri Plaza — Tewksbury, MA, 01876 (RED_E · DC Fast · 120 kW)
  4. Autel - Eco Auto — Tewksbury, MA, 01876 (AUTEL · DC Fast · 40 kW)
  5. Department of Public Health Tewksbury Hospital Lot B — Tewksbury, MA, 01876 (Non-Networked · Level 2 · 19 kW)
  6. TEWKSBURY 2 — Tewksbury, MA, 01876 (ChargePoint Network · Level 2 · 6.5 kW)
  7. TEWKSBURY 1 — Tewksbury, MA, 01876 (ChargePoint Network · Level 2 · 6.5 kW)
  8. TEWKSBURY 3 — Tewksbury, MA, 01876 (ChargePoint Network · Level 2 · 6.5 kW)
  9. TEWKSBURY LIBRARY 2 — Tewksbury, MA, 01876 (ChargePoint Network · Level 2 · 6.5 kW)
  10. AMES POND AMES POND 2 — Tewksbury, MA, 01876 (ChargePoint Network · Level 2 · 6.5 kW)
  11. INNOVATION DR BUILDING 200 — Tewksbury, MA, 01876 (ChargePoint Network · Level 2 · 6.5 kW)
  12. TEWKSBURY LIBRARY 1 — Tewksbury, MA, 01876 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Tewksbury specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Tewksbury, Massachusetts?
There are 15 public electric vehicle charging locations in Tewksbury, Massachusetts, with a combined 50 individual chargers. 4 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Tewksbury?
ChargePoint Network operates the most public charging locations in Tewksbury with 10 sites, followed by Electrify America with 1 sites.
How much does it cost to install an EV charger in Tewksbury?
Level 2 EV chargers in Tewksbury typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Tewksbury?
Most Tewksbury projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Tewksbury?
A typical commercial Level 2 installation in Tewksbury energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Tewksbury take to become profitable?
Payback in Tewksbury depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage