Install EV Chargers in Clinton Township, Michigan

Install EV chargers or analyze a site in Clinton Township, Michigan. 11 existing public charging locations (2 DC fast, 9 Level 2). Free 0–100 profitability score on any Clinton Township address from EV Data Map by Charge Rigs.

Clinton Township, Michigan is served by 11 public electric vehicle charging locations operating 36 individual chargers — an average of 3.3 chargers per site. Of those locations, 2 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Clinton Township is ChargePoint Network with 6 locations, followed by FLO with 3. Average DC fast power across the city is approximately 141 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Clinton Township and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Clinton Township

Clinton Township, Michigan, features a balanced EV charging landscape with 11 public stations across four networks, predominantly serviced by ChargePoint Network, which commands 55% of the locations. The presence of two DC fast charging stations, averaging 141 kW and including a peak at 161 kW, provides valuable options for drivers seeking quicker top-ups. Notably, half of these fast-charging locations are 150 kW-class or higher, making them competitive choices for nearby drivers. This diverse infrastructure positions Clinton Township effectively within the regional charging ecosystem, catering to both rapid needs and longer dwell times while presenting opportunities for growth in higher power charging options.

Clinton Township charging by the numbers

Locations
11
Chargers
36
DC Fast locations
2
Level 2 locations
9

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 3.3. Average DC fast power: 141 kW.

Clinton Township charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 4 networks.
Average DC fast power
141 kW (fastest stall: 161 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 11 locations
Estimated DC ports
13 fast-charging ports city-wide

Charging networks in Clinton Township

The following operators run public charging in Clinton Township, ranked by number of locations.

Featured charging locations in Clinton Township

A selection of higher-power public charging locations across Clinton Township, sorted by power level.

  1. FasCharge 8245 Clinton Township — Clinton Township, MI, 48035 (RED_E · DC Fast · 161 kW)
  2. Moran Chevrolet Clinton Township — Clinton Township, MI, 48035 (EV Connect · DC Fast · 120 kW)
  3. Macomb Community College (Center Campus, Lot 11, N/R bldgs.) — Clinton Township, MI, 48038 (FLO · Level 2 · 16.6 kW)
  4. Macomb Community College (Center Campus, Lot 4, near Cultural Ctr,) — Clinton Township, MI, 48038 (FLO · Level 2 · 16.6 kW)
  5. Macomb Community College (Center Campus, Lot 5B) — Clinton Township, MI, 48038 (FLO · Level 2 · 16.6 kW)
  6. HFHS HF MACOMB 1 — Clinton Township, MI, 48038 (ChargePoint Network · Level 2 · 6.5 kW)
  7. MACOMB COLLEGE EAST CAMPUS 2 — Clinton Township, MI, 48036 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MACOMB COLLEGE EAST CAMPUS 1 — Clinton Township, MI, 48036 (ChargePoint Network · Level 2 · 6.5 kW)
  9. HFHS HF MACOMB 2 — Clinton Township, MI, 48038 (ChargePoint Network · Level 2 · 6.5 kW)
  10. HFHS HF MACOMB 3 — Clinton Township, MI, 48038 (ChargePoint Network · Level 2 · 6.5 kW)
  11. MACOMB COLLEGE BUILDING J LT6 — Clinton Township, MI, 48038 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Clinton Township specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Clinton Township, Michigan?
There are 11 public electric vehicle charging locations in Clinton Township, Michigan, with a combined 36 individual chargers. 2 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Clinton Township?
ChargePoint Network operates the most public charging locations in Clinton Township with 6 sites, followed by FLO with 3 sites.
How much does it cost to install an EV charger in Clinton Township?
Level 2 EV chargers in Clinton Township typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Clinton Township?
Most Clinton Township projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Clinton Township?
A typical commercial Level 2 installation in Clinton Township energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Clinton Township take to become profitable?
Payback in Clinton Township depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.