Install EV Chargers in Warren, Michigan

Install EV chargers or analyze a site in Warren, Michigan. 13 existing public charging locations (2 DC fast, 11 Level 2). Free 0–100 profitability score on any Warren address from EV Data Map by Charge Rigs.

Warren, Michigan is served by 13 public electric vehicle charging locations operating 42 individual chargers — an average of 3.2 chargers per site. Of those locations, 2 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Warren is ChargePoint Network with 7 locations, followed by RED_E with 3. Average DC fast power across the city is approximately 221 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Warren and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Warren

Warren, Michigan presents a balanced charging infrastructure with 13 public locations, featuring a significant 15% dedicated to ultra-fast DC charging. The city’s two DC fast chargers boast an impressive average power of 221 kW, with the highest being 240 kW, ensuring that drivers benefit from rapid charging options that exceed typical US standards. ChargePoint Network dominates the local market, operating 54% of the charging sites, creating a reliable experience for users. This mix allows for both fast and longer-dwell charging needs, catering to a diverse range of EV users. Additionally, the city’s charging landscape, combined with its surrounding infrastructure, informs strategic opportunities for site developers and operators looking to enhance EV accessibility in the area.

Warren charging by the numbers

Locations
13
Chargers
42
DC Fast locations
2
Level 2 locations
11

DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 3.2. Average DC fast power: 221 kW.

Warren charging — local snapshot

Top operator share
ChargePoint Network runs 54% of public locations across 4 networks.
Average DC fast power
221 kW (fastest stall: 240 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
15% DC fast / 85% Level 2 across 13 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Warren

The following operators run public charging in Warren, ranked by number of locations.

Featured charging locations in Warren

A selection of higher-power public charging locations across Warren, sorted by power level.

  1. Chillbox 9031 I696 and Dequindre Rd — Warren, MI, 48091 (RED_E · DC Fast · 240 kW)
  2. Mound Mini Mart — Warren, MI, 48092 (RED_E · DC Fast · 201 kW)
  3. Macomb Community College (South Campus, near T bldg.) — Warren, MI, 48088 (FLO · Level 2 · 16.6 kW)
  4. TownePlace Suites by Marriott Detroit Warren — Warren, MI, 48092 (RED_E · Level 2 · 9.6 kW)
  5. Best Western Warren — Warren, MI, 48092 (Non-Networked · Level 2 · 7.2 kW)
  6. Wayne State University - Advanced Technology Center — Warren, MI, 48088 (Non-Networked · Level 2 · 7.2 kW)
  7. 776 STATION 1 — Warren, MI, 48088 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MEIJER STORES 237 WARREN 3 — Warren, MI, 48092 (ChargePoint Network · Level 2 · 6.5 kW)
  9. MEIJER STORES 237 WARREN 2 — Warren, MI, 48092 (ChargePoint Network · Level 2 · 6.5 kW)
  10. MACOMB COLLEGE S. CAMPUS LOT 1 — Warren, MI, 48088 (ChargePoint Network · Level 2 · 6.5 kW)
  11. MEIJER STORES 306 WARREN 1 — Warren, MI, 48089 (ChargePoint Network · Level 2 · 6.5 kW)
  12. MEIJER STORES 306 WARREN 2 — Warren, MI, 48089 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Warren specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Warren, Michigan?
There are 13 public electric vehicle charging locations in Warren, Michigan, with a combined 42 individual chargers. 2 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Warren?
ChargePoint Network operates the most public charging locations in Warren with 7 sites, followed by RED_E with 3 sites.
How much does it cost to install an EV charger in Warren?
Level 2 EV chargers in Warren typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Warren?
Most Warren projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Warren?
A typical commercial Level 2 installation in Warren energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Warren take to become profitable?
Payback in Warren depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage