Install EV Chargers in Livonia, Michigan

Install EV chargers or analyze a site in Livonia, Michigan. 20 existing public charging locations (10 DC fast, 10 Level 2). Free 0–100 profitability score on any Livonia address from EV Data Map by Charge Rigs.

Livonia, Michigan is served by 20 public electric vehicle charging locations operating 75 individual chargers — an average of 3.8 chargers per site. Of those locations, 10 (50%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Livonia is RED_E with 11 locations, followed by ChargePoint Network with 4. Average DC fast power across the city is approximately 207 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Livonia and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Livonia

Livonia stands out for its competitive EV charging landscape, featuring a robust mix of public charging options with 20 locations shared among 7 distinct operators, predominantly led by RED_E. With 50% of these sites offering DC fast charging, drivers benefit from impressive average power ratings of 207 kW, and 80% of DC fast locations equipped with 150 kW-class or greater capabilities. This ultra-fast infrastructure, highlighted by a peak site at 350 kW, enables EV users to make strategic choices based on power and amenities rather than brand loyalty, fostering a vibrant charging ecosystem. Additionally, the presence of Level 2 chargers caters to longer dwell times, ensuring that Livonia meets diverse charging needs effectively and efficiently.

Livonia charging by the numbers

Locations
20
Chargers
75
DC Fast locations
10
Level 2 locations
10

DC fast share: 50% of locations. Level 2 share: 50%. Average chargers per site: 3.8. Average DC fast power: 207 kW.

Livonia charging — local snapshot

Top operator share
RED_E runs 55% of public locations across 7 networks.
Average DC fast power
207 kW (fastest stall: 350 kW)
High-power share
80% of DC fast sites are 150 kW-class or higher
Mix
50% DC fast / 50% Level 2 across 20 locations
Estimated DC ports
42 fast-charging ports city-wide

Charging networks in Livonia

The following operators run public charging in Livonia, ranked by number of locations.

Featured charging locations in Livonia

A selection of higher-power public charging locations across Livonia, sorted by power level.

  1. Livonia Commons — Livonia, MI, 48150 (eVgo Network · DC Fast · 350 kW)
  2. Meijer 188 (Livonia, MI) — Livonia, MI, 48150 (Electrify America · DC Fast · 350 kW)
  3. Bill Brown Ford Livonia — Livonia, MI, 48150 (RED_E · DC Fast · 240 kW)
  4. GREAT LAKES EV LIVONIA DC4 — Livonia, MI, 48150 (ChargePoint Network · DC Fast · 200 kW)
  5. GREAT LAKES EV LIVONIA DC 3 — Livonia, MI, 48150 (ChargePoint Network · DC Fast · 200 kW)
  6. GREAT LAKES EV LIVONIA DC 1 — Livonia, MI, 48150 (ChargePoint Network · DC Fast · 200 kW)
  7. GREAT LAKES EV LIVONIA DC 2 — Livonia, MI, 48150 (ChargePoint Network · DC Fast · 200 kW)
  8. Meijer - Tesla Supercharger — Livonia, MI, 48150 (Tesla · DC Fast · 150 kW)
  9. Feldman Chevrolet of Livonia — Livonia, MI, 48150 (RED_E · DC Fast · 120 kW)
  10. Embassy Suites Livonia — Livonia, MI, 48152 (RED_E · DC Fast · 60 kW)
  11. BP Station Middlebelt Livonia — Livonia, MI, 48152 (RED_E · Level 2 · 12 kW)
  12. Epic Deals Livonia — Livonia, MI, 48150 (RED_E · Level 2 · 12 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Livonia specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Livonia, Michigan?
There are 20 public electric vehicle charging locations in Livonia, Michigan, with a combined 75 individual chargers. 10 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Livonia?
RED_E operates the most public charging locations in Livonia with 11 sites, followed by ChargePoint Network with 4 sites.
How much does it cost to install an EV charger in Livonia?
Level 2 EV chargers in Livonia typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Livonia?
Most Livonia projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Livonia?
A typical commercial Level 2 installation in Livonia energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Livonia take to become profitable?
Payback in Livonia depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage