Install EV chargers or analyze a site in Livonia, Michigan. 20 existing public charging locations (10 DC fast, 10 Level 2). Free 0–100 profitability score on any Livonia address from EV Data Map by Charge Rigs.
Livonia, Michigan is served by 20 public electric vehicle charging locations operating 75 individual chargers — an average of 3.8 chargers per site. Of those locations, 10 (50%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Livonia is RED_E with 11 locations, followed by ChargePoint Network with 4. Average DC fast power across the city is approximately 207 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Livonia and receive an instant ROI score, demand projection, and recommended charger configuration.
Livonia stands out in the EV charging landscape with 20 public locations that showcase a competitive mix of seven distinct operators, predominantly anchored by RED_E, which controls over half of the sites. The city's public charging infrastructure is robust, featuring an impressive average power output of 207 kW at its 10 DC fast charging locations, with 80% of these stations rated 150 kW or higher. This concentration on ultra-fast charging—especially with the fastest stall reaching an impressive 350 kW—encourages drivers to choose based on power and amenity rather than brand loyalty, making Livonia an attractive destination for EV owners. Furthermore, the blend of DC fast and Level 2 stations effectively addresses varying driver needs, enhancing the overall charging experience.
DC fast share: 50% of locations. Level 2 share: 50%. Average chargers per site: 3.8. Average DC fast power: 207 kW.
The following operators run public charging in Livonia, ranked by number of locations.
A selection of higher-power public charging locations across Livonia, sorted by power level.
Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Livonia specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.