Install EV chargers or analyze a site in Livonia, Michigan. 20 existing public charging locations (10 DC fast, 10 Level 2). Free 0–100 profitability score on any Livonia address from EV Data Map by Charge Rigs.
Livonia, Michigan is served by 20 public electric vehicle charging locations operating 75 individual chargers — an average of 3.8 chargers per site. Of those locations, 10 (50%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Livonia is RED_E with 11 locations, followed by ChargePoint Network with 4. Average DC fast power across the city is approximately 207 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Livonia and receive an instant ROI score, demand projection, and recommended charger configuration.
Livonia's public charging landscape stands out with a competitive mix of seven distinct operators across its 20 locations, fostering diversity that encourages better pricing and uptime. The predominance of DC fast charging, comprising 50% of the total sites, ensures that drivers can access significant power, with an impressive average of 207 kW and the fastest station offering 350 kW. The ultra-fast network, where 80% of DC fast locations exceed 150 kW, caters to the increasing demand for quick, efficient charging options. This nuanced selection allows EV drivers to prioritize power and amenity, making Livonia not only a key hub within the region but also a focal point for charging innovation amidst nearby cities.
DC fast share: 50% of locations. Level 2 share: 50%. Average chargers per site: 3.8. Average DC fast power: 207 kW.
The following operators run public charging in Livonia, ranked by number of locations.
A selection of higher-power public charging locations across Livonia, sorted by power level.
Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Livonia specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.