Install EV chargers or analyze a site in Eagan, Minnesota. 21 existing public charging locations (2 DC fast, 19 Level 2). Free 0–100 profitability score on any Eagan address from EV Data Map by Charge Rigs.
Eagan, Minnesota is served by 21 public electric vehicle charging locations operating 75 individual chargers — an average of 3.6 chargers per site. Of those locations, 2 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Eagan is ChargePoint Network with 9 locations, followed by OpConnect with 5. Average DC fast power across the city is approximately 300 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Eagan and receive an instant ROI score, demand projection, and recommended charger configuration.
Eagan, Minnesota, stands out in the electric vehicle charging landscape with a competitive mix of 21 public charging locations dispersed across 7 distinct networks, including a robust presence from ChargePoint Network. With an average DC fast charging power of 300 kW and the fastest stall reaching 350 kW, Eagan's offerings cater to EV drivers seeking high-performance options. Notably, all DC fast sites are 150 kW-class or higher, ensuring swift charging experiences. This diversity allows drivers to prioritize both power and amenities rather than being locked into a single operator. With 10% of the locations dedicated to DC fast charging and the remainder supporting longer-dwelling Level 2 stations, Eagan offers a comprehensive charging solution that meets varied needs while fostering competitive pricing and uptime.
DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 3.6. Average DC fast power: 300 kW.
The following operators run public charging in Eagan, ranked by number of locations.
A selection of higher-power public charging locations across Eagan, sorted by power level.
Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Eagan specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.