Install EV Chargers in Eagan, Minnesota

Install EV chargers or analyze a site in Eagan, Minnesota. 21 existing public charging locations (2 DC fast, 19 Level 2). Free 0–100 profitability score on any Eagan address from EV Data Map by Charge Rigs.

Eagan, Minnesota is served by 21 public electric vehicle charging locations operating 75 individual chargers — an average of 3.6 chargers per site. Of those locations, 2 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Eagan is ChargePoint Network with 9 locations, followed by OpConnect with 5. Average DC fast power across the city is approximately 300 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Eagan and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Eagan

Eagan’s public charging landscape is marked by a competitive array of 21 locations across seven distinct networks, ensuring drivers have access to diverse charging options. With ChargePoint Network dominating at 43% of these sites, the available infrastructure encourages a nuanced choice based on power and amenities rather than brand loyalty. Notably, the two DC fast chargers average an impressive 300 kW, with the fastest stall reaching 350 kW, positioning Eagan at the forefront of ultra-fast charging capabilities in the region. This high-powered offering, along with the overwhelming presence of 150 kW-class chargers, supports a flexible and efficient experience for EV users, catering to both quick stops and longer-browse charging needs.

Eagan charging by the numbers

Locations
21
Chargers
75
DC Fast locations
2
Level 2 locations
19

DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 3.6. Average DC fast power: 300 kW.

Eagan charging — local snapshot

Top operator share
ChargePoint Network runs 43% of public locations across 7 networks.
Average DC fast power
300 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 21 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Eagan

The following operators run public charging in Eagan, ranked by number of locations.

Featured charging locations in Eagan

A selection of higher-power public charging locations across Eagan, sorted by power level.

  1. Simon-Twin Cities Premium Outlets (Eagan, MN) — Eagan, MN, 55122 (Electrify America · DC Fast · 350 kW)
  2. Cub Foods - Tesla Supercharger — Eagan, MN, 55122 (Tesla · DC Fast · 250 kW)
  3. SOLVENTUM EAGAN STATION 2 — Eagan, MN, 55121 (ChargePoint Network · Level 2 · 19.2 kW)
  4. SOLVENTUM EAGAN STATION 3 — Eagan, MN, 55121 (ChargePoint Network · Level 2 · 19.2 kW)
  5. SOLVENTUM EAGAN STATION 4 — Eagan, MN, 55121 (ChargePoint Network · Level 2 · 19.2 kW)
  6. SOLVENTUM EAGAN STATION 1 — Eagan, MN, 55121 (ChargePoint Network · Level 2 · 19.2 kW)
  7. Electric123 — Eagan, MN, 55123 (Non-Networked · Level 2 · 11.5 kW)
  8. Viking Lakes Building B - Garage — Eagan, MN, 55121 (OpConnect · Level 2 · 7.7 kW)
  9. Viking Lakes Building D - Garage — Eagan, MN, 55121 (OpConnect · Level 2 · 7.7 kW)
  10. VLIC Parking Ramp — Eagan, MN, 55121 (OpConnect · Level 2 · 7.7 kW)
  11. Viking Lakes Building A - Garage — Eagan, MN, 55121 (OpConnect · Level 2 · 7.7 kW)
  12. Viking Lakes Building C - Garage — Eagan, MN, 55121 (OpConnect · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Eagan specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Eagan, Minnesota?
There are 21 public electric vehicle charging locations in Eagan, Minnesota, with a combined 75 individual chargers. 2 locations offer DC fast charging and 19 provide Level 2 charging.
What is the largest EV charging network in Eagan?
ChargePoint Network operates the most public charging locations in Eagan with 9 sites, followed by OpConnect with 5 sites.
How much does it cost to install an EV charger in Eagan?
Level 2 EV chargers in Eagan typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Eagan?
Most Eagan projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Minnesota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Eagan?
A typical commercial Level 2 installation in Eagan energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Eagan take to become profitable?
Payback in Eagan depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage