Install EV chargers or analyze a site in Eagan, Minnesota. 21 existing public charging locations (2 DC fast, 19 Level 2). Free 0–100 profitability score on any Eagan address from EV Data Map by Charge Rigs.
Eagan, Minnesota is served by 21 public electric vehicle charging locations operating 75 individual chargers — an average of 3.6 chargers per site. Of those locations, 2 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Eagan is ChargePoint Network with 9 locations, followed by OpConnect with 5. Average DC fast power across the city is approximately 300 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Eagan and receive an instant ROI score, demand projection, and recommended charger configuration.
Eagan’s public charging landscape is marked by a competitive array of 21 locations across seven distinct networks, ensuring drivers have access to diverse charging options. With ChargePoint Network dominating at 43% of these sites, the available infrastructure encourages a nuanced choice based on power and amenities rather than brand loyalty. Notably, the two DC fast chargers average an impressive 300 kW, with the fastest stall reaching 350 kW, positioning Eagan at the forefront of ultra-fast charging capabilities in the region. This high-powered offering, along with the overwhelming presence of 150 kW-class chargers, supports a flexible and efficient experience for EV users, catering to both quick stops and longer-browse charging needs.
DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 3.6. Average DC fast power: 300 kW.
The following operators run public charging in Eagan, ranked by number of locations.
A selection of higher-power public charging locations across Eagan, sorted by power level.
Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Eagan specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.