Install EV Chargers in St. Paul, Minnesota

Install EV chargers or analyze a site in St. Paul, Minnesota. 18 existing public charging locations (3 DC fast, 15 Level 2). Free 0–100 profitability score on any St. Paul address from EV Data Map by Charge Rigs.

St. Paul, Minnesota is served by 18 public electric vehicle charging locations operating 54 individual chargers — an average of 3.0 chargers per site. Of those locations, 3 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in St. Paul is Non-Networked with 11 locations, followed by RED_E with 3. Average DC fast power across the city is approximately 213 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in St. Paul and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in St. Paul

St. Paul, Minnesota presents a unique EV charging landscape characterized by a notable dependence on Non-Networked operators, which command 61% of the city's 18 public charging stations. This concentration may present challenges regarding pricing and reliability for new site developers. However, the three DC fast charging locations offer an impressive average power output of 213 kW, with 67% of these sites rated 150 kW or higher, positioning them well above the national average. With only 17% of public stations equipped for fast charging, strategic development opportunities still exist in meeting the demands of local EV drivers for both quick and long-dwell charging solutions. Evaluating potential sites against this distinct mix can help identify the most promising gaps in St. Paul's charging network.

St. Paul charging by the numbers

Locations
18
Chargers
54
DC Fast locations
3
Level 2 locations
15

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 3.0. Average DC fast power: 213 kW.

St. Paul charging — local snapshot

Top operator share
Non-Networked runs 61% of public locations across 6 networks.
Average DC fast power
213 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 18 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in St. Paul

The following operators run public charging in St. Paul, ranked by number of locations.

Featured charging locations in St. Paul

A selection of higher-power public charging locations across St. Paul, sorted by power level.

  1. McD #671 Jefferson — St. Paul, MN, 55102 (eVgo Network · DC Fast · 350 kW)
  2. Target - Tesla Supercharger — St. Paul, MN, 55104 (Tesla · DC Fast · 250 kW)
  3. Macalester College Tennis Courts — St Paul, MN, 55105 (RED_E · DC Fast · 40 kW)
  4. Macalester College Grand Ave Lot — St Paul, MN, 55105 (RED_E · Level 2 · 19.2 kW)
  5. Macalester College Central Lot — St Paul, MN, 55105 (RED_E · Level 2 · 7.7 kW)
  6. Minneapolis-St. Paul International Airport - Terminal 1 Red Ramp — St. Paul, MN, 55111 (Non-Networked · Level 2 · 7.2 kW)
  7. World Trade Center Parking Ramp — St. Paul, MN, 55101 (Non-Networked · Level 2 · 7.2 kW)
  8. Jimmy Lee Recreational Center — St. Paul, MN, 55104 (Non-Networked · Level 2 · 7.2 kW)
  9. HealthPartners Neuroscience Specialty Center — St. Paul, MN, 55130 (Non-Networked · Level 2 · 7.2 kW)
  10. Margaret St Parking — St. Paul, MN, 55101 (Non-Networked · Level 2 · 7.2 kW)
  11. CPKC St. Paul Battle Creek Yard - Employee Charger — St Paul, MN, 55119 (AMPUP · Level 2 · 7.2 kW)
  12. beKind Salon and Spa — St. Paul, MN, 55110 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For St. Paul specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in St. Paul, Minnesota?
There are 18 public electric vehicle charging locations in St. Paul, Minnesota, with a combined 54 individual chargers. 3 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in St. Paul?
Non-Networked operates the most public charging locations in St. Paul with 11 sites, followed by RED_E with 3 sites.
How much does it cost to install an EV charger in St. Paul?
Level 2 EV chargers in St. Paul typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in St. Paul?
Most St. Paul projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Minnesota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in St. Paul?
A typical commercial Level 2 installation in St. Paul energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in St. Paul take to become profitable?
Payback in St. Paul depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.