Install EV Chargers in Saint Paul, Minnesota

Install EV chargers or analyze a site in Saint Paul, Minnesota. 94 existing public charging locations (10 DC fast, 84 Level 2). Free 0–100 profitability score on any Saint Paul address from EV Data Map by Charge Rigs.

Saint Paul, Minnesota is served by 94 public electric vehicle charging locations operating 181 individual chargers — an average of 1.9 chargers per site. Of those locations, 10 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 84 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Saint Paul is ChargePoint Network with 50 locations, followed by ZEFNET with 41. Average DC fast power across the city is approximately 88 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Saint Paul and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Saint Paul

Saint Paul, Minnesota showcases a balanced approach to EV charging infrastructure with 93 public locations split among three distinct networks, predominantly ChargePoint Network, which constitutes over half of the sites. The city features a modest 11% of its charging options as DC fast chargers, averaging 88 kW, with a notable 30% of these stations operating at 150 kW or more. This positions Saint Paul in a unique space where the blend of Level 2 chargers caters to longer-dwell needs, while the available fast charging sites appeal to those prioritizing quicker refueling. As newer high-power charging solutions begin entering the market, navigating through Saint Paul's existing infrastructure and the emerging power landscape will be crucial for developers and operators looking to optimize their strategies.

Saint Paul charging by the numbers

Locations
94
Chargers
181
DC Fast locations
10
Level 2 locations
84

DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 1.9. Average DC fast power: 88 kW.

Saint Paul charging — local snapshot

Top operator share
ChargePoint Network runs 53% of public locations across 3 networks.
Average DC fast power
88 kW (fastest stall: 250 kW)
High-power share
30% of DC fast sites are 150 kW-class or higher
Mix
11% DC fast / 89% Level 2 across 94 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Saint Paul

The following operators run public charging in Saint Paul, ranked by number of locations.

Featured charging locations in Saint Paul

A selection of higher-power public charging locations across Saint Paul, sorted by power level.

  1. BUERKLE HYUNDAI HYUNDAI S2 — Saint Paul, MN, 55110 (ChargePoint Network · DC Fast · 250 kW)
  2. BUERKLE HYUNDAI BUERKLE HYUNDAI — Saint Paul, MN, 55110 (ChargePoint Network · DC Fast · 250 kW)
  3. Lot W Jackson & 14th — Saint Paul, MN, 55101 (ZEFNET · DC Fast · 150 kW)
  4. LXL LANDING PARKING LOT 250 — Saint Paul, MN, 55116 (ChargePoint Network · DC Fast · 62.5 kW)
  5. Aurora & Rice — Saint Paul, MN, 55103 (ZEFNET · DC Fast · 50 kW)
  6. Cesar Chavez — Saint Paul, MN, 55107 (ZEFNET · DC Fast · 50 kW)
  7. League of Minnesota Cities - DCFC — Saint Paul, MN, 55103 (Blink Network · DC Fast · 30 kW)
  8. St Joseph's Lane & 7th St — Saint Paul, MN, 55102 (ZEFNET · DC Fast · 11.9 kW)
  9. Carleton & University — Saint Paul, MN, 55114 (ZEFNET · DC Fast · 11.7 kW)
  10. Bates & 7th — Saint Paul, MN, 55106 (ZEFNET · DC Fast · 11.6 kW)
  11. League of Minnesota cities - Series — Saint Paul, MN, 55103 (Blink Network · Level 2 · 16.6 kW)
  12. Margaret & 7th — Saint Paul, MN, 55106 (ZEFNET · Level 2 · 12 kW)

Nearby cities with EV charging coverage

Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Saint Paul specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 84 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Saint Paul, Minnesota?
There are 94 public electric vehicle charging locations in Saint Paul, Minnesota, with a combined 181 individual chargers. 10 locations offer DC fast charging and 84 provide Level 2 charging.
What is the largest EV charging network in Saint Paul?
ChargePoint Network operates the most public charging locations in Saint Paul with 50 sites, followed by ZEFNET with 41 sites.
How much does it cost to install an EV charger in Saint Paul?
Level 2 EV chargers in Saint Paul typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Saint Paul?
Most Saint Paul projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Minnesota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Saint Paul?
A typical commercial Level 2 installation in Saint Paul energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Saint Paul take to become profitable?
Payback in Saint Paul depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.