Install EV Chargers in Plymouth, Minnesota

Install EV chargers or analyze a site in Plymouth, Minnesota. 29 existing public charging locations (17 DC fast, 12 Level 2). Free 0–100 profitability score on any Plymouth address from EV Data Map by Charge Rigs.

Plymouth, Minnesota is served by 29 public electric vehicle charging locations operating 124 individual chargers — an average of 4.3 chargers per site. Of those locations, 17 (59%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (41%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Plymouth is DIRT_ROAD with 13 locations, followed by ChargePoint Network with 11. Average DC fast power across the city is approximately 87 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Plymouth and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Plymouth

Plymouth offers a unique and competitive landscape for EV charging, featuring 29 public locations that include a significant 59% dedicated to DC fast charging. With the predominant operator, DIRT_ROAD, accounting for nearly half of these sites, drivers benefit from both competitive pricing and diverse service options. The average power at DC fast stations is 87 kW, although 35% of these locations boast chargers rated at 150 kW or higher, catering to the growing demand for quicker charging solutions. This combination of fast-charging capabilities and Level 2 options allows users to strategically choose based on their travel needs and preferences, emphasizing the city’s commitment to accommodating a range of EV drivers effectively.

Plymouth charging by the numbers

Locations
29
Chargers
124
DC Fast locations
17
Level 2 locations
12

DC fast share: 59% of locations. Level 2 share: 41%. Average chargers per site: 4.3. Average DC fast power: 87 kW.

Plymouth charging — local snapshot

Top operator share
DIRT_ROAD runs 45% of public locations across 6 networks.
Average DC fast power
87 kW (fastest stall: 180 kW)
High-power share
35% of DC fast sites are 150 kW-class or higher
Mix
59% DC fast / 41% Level 2 across 29 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Plymouth

The following operators run public charging in Plymouth, ranked by number of locations.

Featured charging locations in Plymouth

A selection of higher-power public charging locations across Plymouth, sorted by power level.

  1. Plymouth City Hall — Plymouth, MN, 55447 (DIRT_ROAD · DC Fast · 180 kW)
  2. Plymouth Community Center — Plymouth, MN, 55448 (DIRT_ROAD · DC Fast · 180 kW)
  3. CircleK - Plymouth — Plymouth, MN, 55447 (CIRCLE_K · DC Fast · 180 kW)
  4. Plymouth Ice Center — Plymouth, MN, 55446 (DIRT_ROAD · DC Fast · 180 kW)
  5. Plymouth Maintenance Facility — Plymouth, MN, 55447 (DIRT_ROAD · DC Fast · 180 kW)
  6. Station 73 Park & Ride — Plymouth, MN, 55441 (DIRT_ROAD · DC Fast · 180 kW)
  7. Superior Ford-Plymouth-DCFC — Plymouth, MN, 55442 (Blink Network · DC Fast · 120 kW)
  8. EMC LLC GATEWAY 2 — Plymouth, MN, 55447 (ChargePoint Network · DC Fast · 62.5 kW)
  9. East Medicine Lake — Plymouth, MN, 55441 (DIRT_ROAD · DC Fast · 24 kW)
  10. Parkers Lake Playfield — Plymouth, MN, 55447 (DIRT_ROAD · DC Fast · 24 kW)
  11. Parkers Lake — Plymouth, MN, 55447 (DIRT_ROAD · DC Fast · 24 kW)
  12. NW Greenway North — Plymouth, MN, 55446 (DIRT_ROAD · DC Fast · 24 kW)

Nearby cities with EV charging coverage

Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Plymouth specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 17 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Plymouth, Minnesota?
There are 29 public electric vehicle charging locations in Plymouth, Minnesota, with a combined 124 individual chargers. 17 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Plymouth?
DIRT_ROAD operates the most public charging locations in Plymouth with 13 sites, followed by ChargePoint Network with 11 sites.
How much does it cost to install an EV charger in Plymouth?
Level 2 EV chargers in Plymouth typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Plymouth?
Most Plymouth projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Minnesota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Plymouth?
A typical commercial Level 2 installation in Plymouth energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Plymouth take to become profitable?
Payback in Plymouth depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.