Install EV Chargers in Burlington, North Carolina

Install EV chargers or analyze a site in Burlington, North Carolina. 11 existing public charging locations (6 DC fast, 5 Level 2). Free 0–100 profitability score on any Burlington address from EV Data Map by Charge Rigs.

Burlington, North Carolina is served by 11 public electric vehicle charging locations operating 49 individual chargers — an average of 4.5 chargers per site. Of those locations, 6 (55%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (45%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Burlington is Blink Network with 2 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 131 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Burlington and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Burlington

Burlington boasts a diverse public charging infrastructure with 11 locations managed by seven distinct operators, enhancing competitiveness and choice for EV drivers. The city’s DC fast charging network, comprising 55% of all stations, averages a robust 131 kW, with half of these sites offering 150 kW or more, making it a strong contender for high-efficiency charging. The presence of varying operators, such as Blink Network and Tesla, allows drivers to select charging options based on power preferences and amenities rather than being tied to a single provider. This strategic setup, combined with a rapid charging option that peaks at 250 kW, positions Burlington as a nuanced destination for EV users seeking both speed and reliability in their charging experience.

Burlington charging by the numbers

Locations
11
Chargers
49
DC Fast locations
6
Level 2 locations
5

DC fast share: 55% of locations. Level 2 share: 45%. Average chargers per site: 4.5. Average DC fast power: 131 kW.

Burlington charging — local snapshot

Top operator share
Blink Network runs 18% of public locations across 7 networks.
Average DC fast power
131 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
55% DC fast / 45% Level 2 across 11 locations
Estimated DC ports
34 fast-charging ports city-wide

Charging networks in Burlington

The following operators run public charging in Burlington, ranked by number of locations.

Featured charging locations in Burlington

A selection of higher-power public charging locations across Burlington, sorted by power level.

  1. Burlington, NC - Garden Road - Tesla Supercharger — Burlington, NC, 27215 (Tesla · DC Fast · 250 kW)
  2. Stearns ford — Burlington, NC, 27215 (RED_E · DC Fast · 240 kW)
  3. Alamance Crossing - Tesla Supercharger — Burlington, NC, 27215 (Tesla · DC Fast · 150 kW)
  4. Westcott Buick GMC — BURLINGTON, NC, 27215 (EV Connect · DC Fast · 50 kW)
  5. Modern Chevrolet Cadillac of Burlington — Burlington, NC, 27215 (EV Connect · DC Fast · 50 kW)
  6. Carolina Nissan — Burlington, NC, 27215 (Non-Networked · DC Fast · 44 kW)
  7. Rudys Performance Parts — Burlington, NC, 27215 (Blink Network · Level 2 · 21.6 kW)
  8. Courtyard Burlington — Burlington, NC, 27215 (Blink Network · Level 2 · 11.5 kW)
  9. Smithfield's Chicken 'N Bar-B-Q-Burlington - Tesla Destination — Burlington, NC, 27215 (Tesla Destination · Level 2 · 7.2 kW)
  10. Country Inn & Suites - Burlington, NC - Tesla Destination — Burlington, NC, 27215 (Tesla Destination · Level 2 · 7.2 kW)
  11. LOT 1 BURLINGTON 1 — Burlington, NC, 27215 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in North Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Burlington specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 5 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Burlington, North Carolina?
There are 11 public electric vehicle charging locations in Burlington, North Carolina, with a combined 49 individual chargers. 6 locations offer DC fast charging and 5 provide Level 2 charging.
What is the largest EV charging network in Burlington?
Blink Network operates the most public charging locations in Burlington with 2 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in Burlington?
Level 2 EV chargers in Burlington typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Burlington?
Most Burlington projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with North Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Burlington?
A typical commercial Level 2 installation in Burlington energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Burlington take to become profitable?
Payback in Burlington depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.