Install EV Chargers in High Point, North Carolina

Install EV chargers or analyze a site in High Point, North Carolina. 11 existing public charging locations (4 DC fast, 7 Level 2). Free 0–100 profitability score on any High Point address from EV Data Map by Charge Rigs.

High Point, North Carolina is served by 11 public electric vehicle charging locations operating 22 individual chargers — an average of 2.0 chargers per site. Of those locations, 4 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in High Point is ChargePoint Network with 8 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 53 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in High Point and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in High Point

High Point, North Carolina, features a public charging landscape where ChargePoint Network dominates with 73% of the 11 locations. This heavy reliance on a single operator influences the network's reliability and pricing dynamics, critical factors for site developers. The four DC fast charging stations, averaging 53 kW with a peak of 63 kW, represent an older generation of infrastructure, emphasizing an opportunity for new entrants with higher-capacity chargers between 150 to 350 kW. With 36% of the public charging locations offering DC fast options, there's a clear differentiation between these and the Level 2 chargers, primarily servicing longer dwell times. EV Data Map can help pinpoint optimal sites to meet emerging demands in High Point's growing EV ecosystem.

High Point charging by the numbers

Locations
11
Chargers
22
DC Fast locations
4
Level 2 locations
7

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 2.0. Average DC fast power: 53 kW.

High Point charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 3 networks.
Average DC fast power
53 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 11 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in High Point

The following operators run public charging in High Point, ranked by number of locations.

Featured charging locations in High Point

A selection of higher-power public charging locations across High Point, sorted by power level.

  1. NEW HYUNDAI HYUNDAI FRONT — High Point, NC, 27262 (ChargePoint Network · DC Fast · 62.5 kW)
  2. NEW HYUNDAI HYUNDAI SIDE — High Point, NC, 27262 (ChargePoint Network · DC Fast · 62.5 kW)
  3. HIGHPOINT SPK CPE250 1 — High Point, NC, 27265 (ChargePoint Network · DC Fast · 62 kW)
  4. KIA 1 KIAFAST — High Point, NC, 27262 (ChargePoint Network · DC Fast · 24 kW)
  5. Crescent Ford — High Point, NC, 27265 (Blink Network · Level 2 · 21.6 kW)
  6. High Point University — High Point, NC, 27262 (Blink Network · Level 2 · 10.8 kW)
  7. High Point NC Public Library — High Point, NC, 27262 (OpConnect · Level 2 · 7.7 kW)
  8. HIGH POINT ELEC TRUIST RIGHT — High Point, NC, 27262 (ChargePoint Network · Level 2 · 6.5 kW)
  9. HIGH POINT ELEC TRUIST LEFT — High Point, NC, 27262 (ChargePoint Network · Level 2 · 6.5 kW)
  10. HIGH POINT ELEC BLAIR PARK — High Point, NC, 27260 (ChargePoint Network · Level 2 · 6.5 kW)
  11. HIGH POINT ELEC OAK HOLLOW GOLF — High Point, NC, 27265 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in North Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For High Point specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in High Point, North Carolina?
There are 11 public electric vehicle charging locations in High Point, North Carolina, with a combined 22 individual chargers. 4 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in High Point?
ChargePoint Network operates the most public charging locations in High Point with 8 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in High Point?
Level 2 EV chargers in High Point typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in High Point?
Most High Point projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with North Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in High Point?
A typical commercial Level 2 installation in High Point energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in High Point take to become profitable?
Payback in High Point depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage