Install EV Chargers in Akron, Ohio

Install EV chargers or analyze a site in Akron, Ohio. 39 existing public charging locations (6 DC fast, 33 Level 2). Free 0–100 profitability score on any Akron address from EV Data Map by Charge Rigs.

Akron, Ohio is served by 39 public electric vehicle charging locations operating 88 individual chargers — an average of 2.3 chargers per site. Of those locations, 6 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 33 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Akron is ChargePoint Network with 22 locations, followed by Tesla Destination with 5. Average DC fast power across the city is approximately 48 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Akron and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Akron

Akron, Ohio, offers a diverse public charging landscape with 39 locations managed by eight distinct operators, making it an attractive option for EV drivers who value choice. While 15% of these sites provide DC fast charging at an average of 48 kW—highlighted by a maximum output of 80 kW—the lack of higher-capacity 150 kW-class chargers suggests potential for growth in fast-charging capabilities. The dominance of the ChargePoint Network, with over half of the charging sites, fosters competitive pricing and availability, enabling drivers to select based on their specific power needs and amenities. For those navigating the region, understanding this mix of charging options is essential as it shapes the EV experience and future opportunities for infrastructure enhancement.

Akron charging by the numbers

Locations
39
Chargers
88
DC Fast locations
6
Level 2 locations
33

DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 2.3. Average DC fast power: 48 kW.

Akron charging — local snapshot

Top operator share
ChargePoint Network runs 56% of public locations across 8 networks.
Average DC fast power
48 kW (fastest stall: 80 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
15% DC fast / 85% Level 2 across 39 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Akron

The following operators run public charging in Akron, ranked by number of locations.

Featured charging locations in Akron

A selection of higher-power public charging locations across Akron, sorted by power level.

  1. Radisson Hotel Akron/Fairlawn — Akron, OH, 44321 (UNIVERSAL · DC Fast · 80 kW)
  2. Serra Honda — Akron, OH, 44312 (Blink Network · DC Fast · 60 kW)
  3. Summit County Public Health — Akron, OH, 44313 (CHARGELAB · DC Fast · 50 kW)
  4. VANDEVERE CADILLAC — AKRON, OH, 44303 (EV Connect · DC Fast · 50 kW)
  5. Serra Chevrolet — Akron, OH, 44312 (Non-Networked · DC Fast · 25 kW)
  6. Stonemill — Akron, OH, 44333 (DIRT_ROAD · DC Fast · 24 kW)
  7. SUMMIT TOYOTA STATION 1 — Akron, OH, 44320 (ChargePoint Network · Level 2 · 12 kW)
  8. Akron General Medical Center - Akron — Akron, OH, 44307 (Blink Network · Level 2 · 10.8 kW)
  9. Akron General Medical Center (Bath) - Series 7 — Akron, OH, 44333 (Blink Network · Level 2 · 8.3 kW)
  10. DoubleTree by Hilton Hotel Akron - Fairlawn - Tesla Destination — Akron, OH, 44333 (Tesla Destination · Level 2 · 7.2 kW)
  11. Cascade Parking Deck — Akron, OH, 44308 (Non-Networked · Level 2 · 7.2 kW)
  12. Embassy Suites Akron-Canton Airport - Tesla Destination — Akron, OH, 44720 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Akron specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 33 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Akron, Ohio?
There are 39 public electric vehicle charging locations in Akron, Ohio, with a combined 88 individual chargers. 6 locations offer DC fast charging and 33 provide Level 2 charging.
What is the largest EV charging network in Akron?
ChargePoint Network operates the most public charging locations in Akron with 22 sites, followed by Tesla Destination with 5 sites.
How much does it cost to install an EV charger in Akron?
Level 2 EV chargers in Akron typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Akron?
Most Akron projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Akron?
A typical commercial Level 2 installation in Akron energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Akron take to become profitable?
Payback in Akron depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage