Install EV Chargers in Lakewood, Ohio

Install EV chargers or analyze a site in Lakewood, Ohio. 15 existing public charging locations (2 DC fast, 13 Level 2). Free 0–100 profitability score on any Lakewood address from EV Data Map by Charge Rigs.

Lakewood, Ohio is served by 15 public electric vehicle charging locations operating 26 individual chargers — an average of 1.7 chargers per site. Of those locations, 2 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lakewood is ChargePoint Network with 13 locations, followed by FLO with 1. Average DC fast power across the city is approximately 56 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lakewood and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lakewood

Lakewood, Ohio's EV charging infrastructure is notably characterized by its reliance on the ChargePoint Network, which accounts for 87% of the city's 15 public charging locations. This concentration signals a potential vulnerability regarding uptime and pricing, key considerations for any site developer aiming to enter the market. With only 13% of charging sites offering DC fast options averaging 56 kW—culminating in a peak of 63 kW—new operations that introduce higher-capacity hardware could stand out significantly in the local landscape. Simultaneously, the dominance of Level 2 chargers caters to longer-dwell Charging, revealing an opportunity for innovative providers to strategically enhance Lakewood’s charging capabilities to better meet evolving driver needs.

Lakewood charging by the numbers

Locations
15
Chargers
26
DC Fast locations
2
Level 2 locations
13

DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 1.7. Average DC fast power: 56 kW.

Lakewood charging — local snapshot

Top operator share
ChargePoint Network runs 87% of public locations across 3 networks.
Average DC fast power
56 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 15 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Lakewood

The following operators run public charging in Lakewood, ranked by number of locations.

Featured charging locations in Lakewood

A selection of higher-power public charging locations across Lakewood, sorted by power level.

  1. LAKEWOOD KAUFFMAN PARK — Lakewood, OH, 44107 (ChargePoint Network · DC Fast · 62.5 kW)
  2. LAKEWOOD WINTERHURST — Lakewood, OH, 44107 (ChargePoint Network · DC Fast · 50 kW)
  3. TRINITY BLOCK 19.2KW — Lakewood, OH, 44107 (ChargePoint Network · Level 2 · 19.2 kW)
  4. Lakewood High School (Civic Auditorium) — Lakewood, OH, 44107 (FLO · Level 2 · 7.2 kW)
  5. Westside Family Dental — Lakewood, OH, 44107 (Non-Networked · Level 2 · 7.2 kW)
  6. LAKEWOOD CITY CENTER PRK — Lakewood, OH, 44107 (ChargePoint Network · Level 2 · 6.5 kW)
  7. LAKEWOOD RECYCLING 2 — Lakewood, OH, 44107 (ChargePoint Network · Level 2 · 6.5 kW)
  8. LAKEWOOD SKATE HOUSE — Lakewood, OH, 44107 (ChargePoint Network · Level 2 · 6.5 kW)
  9. LAKEWOOD RECYCLING 1 — Lakewood, OH, 44107 (ChargePoint Network · Level 2 · 6.5 kW)
  10. LAKEWOOD PARK HAVEN ROW — Lakewood, OH, 44107 (ChargePoint Network · Level 2 · 6.5 kW)
  11. LAKEWOOD WEST END GATEWY — Lakewood, OH, 44107 (ChargePoint Network · Level 2 · 6.5 kW)
  12. LAKEWOOD LKWD PARK SOUTH — Lakewood, OH, 44107 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lakewood specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lakewood, Ohio?
There are 15 public electric vehicle charging locations in Lakewood, Ohio, with a combined 26 individual chargers. 2 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Lakewood?
ChargePoint Network operates the most public charging locations in Lakewood with 13 sites, followed by FLO with 1 sites.
How much does it cost to install an EV charger in Lakewood?
Level 2 EV chargers in Lakewood typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lakewood?
Most Lakewood projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lakewood?
A typical commercial Level 2 installation in Lakewood energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lakewood take to become profitable?
Payback in Lakewood depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.