Install EV Chargers in Wooster, Ohio

Install EV chargers or analyze a site in Wooster, Ohio. 13 existing public charging locations (4 DC fast, 9 Level 2). Free 0–100 profitability score on any Wooster address from EV Data Map by Charge Rigs.

Wooster, Ohio is served by 13 public electric vehicle charging locations operating 26 individual chargers — an average of 2.0 chargers per site. Of those locations, 4 (31%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (69%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Wooster is ChargePoint Network with 6 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 123 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Wooster and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Wooster

Wooster offers a competitive landscape for EV charging, featuring 13 public locations spread across six distinct operators, with ChargePoint Network leading at 46% of sites. Drivers benefit from a nuanced selection based on power delivery, as the city's four DC fast chargers average 123 kW, with half rated at 150 kW or higher and a top speed of 201 kW. This balance of DC fast and nine Level 2 chargers allows for flexible charging solutions catering to different needs. As the local market evolves, new entrants with higher output equipment can elevate the charging experience. The diversity in service providers ensures competitive pricing and uptime, making Wooster a strategic hub for EV users navigating the area and beyond.

Wooster charging by the numbers

Locations
13
Chargers
26
DC Fast locations
4
Level 2 locations
9

DC fast share: 31% of locations. Level 2 share: 69%. Average chargers per site: 2.0. Average DC fast power: 123 kW.

Wooster charging — local snapshot

Top operator share
ChargePoint Network runs 46% of public locations across 6 networks.
Average DC fast power
123 kW (fastest stall: 201 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
31% DC fast / 69% Level 2 across 13 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Wooster

The following operators run public charging in Wooster, ranked by number of locations.

Featured charging locations in Wooster

A selection of higher-power public charging locations across Wooster, sorted by power level.

  1. Bellstores Wooster — Wooster, OH, 44691 (RED_E · DC Fast · 201 kW)
  2. Wooster Chrysler Jeep Dodge Ram — Wooster, OH, 44691 (Blink Network · DC Fast · 180 kW)
  3. CITY OF WOOSTER N BUCKEYE 2 — Wooster, OH, 44691 (ChargePoint Network · DC Fast · 62.5 kW)
  4. CITY OF WOOSTER N BUCKEYE 1 — Wooster, OH, 44691 (ChargePoint Network · DC Fast · 50 kW)
  5. Local Roots Market & Caf‚àö¬© - Tesla Destination — Wooster, OH, 44691 (Tesla Destination · Level 2 · 7.2 kW)
  6. BellStores (Columbus Ave) — Wooster, OH, 44691 (Non-Networked · Level 2 · 7.2 kW)
  7. Wooster Dental — Wooster, OH, 44691 (Non-Networked · Level 2 · 7 kW)
  8. SWTCH Energy Inc. — Wooster, OH, 44691 (SWTCH · Level 2 · 6.6 kW)
  9. Liberty Beall Apartments Parking — Wooster, OH, 44691 (SWTCH · Level 2 · 6.6 kW)
  10. OHIO STATE UNV WOOSTER EVCS1 — Wooster, OH, 44691 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CITY OF WOOSTER NE QUAD 1 — Wooster, OH, 44691 (ChargePoint Network · Level 2 · 6.5 kW)
  12. WCH WCH WINTER ST. — Wooster, OH, 44691 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Wooster specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Wooster, Ohio?
There are 13 public electric vehicle charging locations in Wooster, Ohio, with a combined 26 individual chargers. 4 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Wooster?
ChargePoint Network operates the most public charging locations in Wooster with 6 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Wooster?
Level 2 EV chargers in Wooster typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Wooster?
Most Wooster projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Wooster?
A typical commercial Level 2 installation in Wooster energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Wooster take to become profitable?
Payback in Wooster depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage