Install EV chargers or analyze a site in Kent, Ohio. 22 existing public charging locations (4 DC fast, 18 Level 2). Free 0–100 profitability score on any Kent address from EV Data Map by Charge Rigs.
Kent, Ohio is served by 22 public electric vehicle charging locations operating 48 individual chargers — an average of 2.2 chargers per site. Of those locations, 4 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 18 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Kent is Blink Network with 9 locations, followed by ChargePoint Network with 8. Average DC fast power across the city is approximately 223 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Kent and receive an instant ROI score, demand projection, and recommended charger configuration.
Kent, Ohio stands out in the realm of electric vehicle charging with a balanced mix of public infrastructure, featuring 22 locations across four distinct networks. The presence of four DC fast chargers, averaging an impressive 223 kW, ensures that drivers have access to ultra-fast charging options, especially with 100% of these sites rated 150 kW or more. Blink Network is the dominant player, accounting for a significant 41% of charging sites, while the variety of networks prevents dependency on a single provider. This diverse charging landscape meets both immediate power needs and longer-term Level 2 requirements, making Kent an appealing destination for EV drivers looking for efficiency and reliability amidst a strong regional ecosystem.
DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.2. Average DC fast power: 223 kW.
The following operators run public charging in Kent, ranked by number of locations.
A selection of higher-power public charging locations across Kent, sorted by power level.
Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Kent specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 18 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.