Install EV Chargers in North Canton, Ohio

Install EV chargers or analyze a site in North Canton, Ohio. 11 existing public charging locations (4 DC fast, 7 Level 2). Free 0–100 profitability score on any North Canton address from EV Data Map by Charge Rigs.

North Canton, Ohio is served by 11 public electric vehicle charging locations operating 30 individual chargers — an average of 2.7 chargers per site. Of those locations, 4 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in North Canton is ChargePoint Network with 6 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 181 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in North Canton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in North Canton

North Canton boasts a competitive public charging landscape with 11 locations provided by 5 distinct operators, with ChargePoint Network leading at 55% of sites. This diverse offering not only enhances pricing and uptime but also allows drivers to make informed choices based on power and amenities. The city features a modern mix of charging options: 36% are fast chargers, averaging 181 kW, including a standout site delivering 350 kW. Half of the fast locations operate at 150 kW or above, positioning North Canton favorably against other nearby cities. With about 16 DC fast ports available, the local infrastructure offers robust support for a growing EV market, allowing for targeted filling of service gaps based on user demand.

North Canton charging by the numbers

Locations
11
Chargers
30
DC Fast locations
4
Level 2 locations
7

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 2.7. Average DC fast power: 181 kW.

North Canton charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 5 networks.
Average DC fast power
181 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 11 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in North Canton

The following operators run public charging in North Canton, ranked by number of locations.

Featured charging locations in North Canton

A selection of higher-power public charging locations across North Canton, sorted by power level.

  1. Belden Park Crossings — North Canton, OH, 44720 (eVgo Network · DC Fast · 350 kW)
  2. GetGo - Tesla Supercharger — North Canton, OH, 44720 (Tesla · DC Fast · 250 kW)
  3. MEGA LOT STARK STATE 2 — North Canton, OH, 44720 (ChargePoint Network · DC Fast · 62.5 kW)
  4. MEGA LOT FRANK 1 — North Canton, OH, 44720 (ChargePoint Network · DC Fast · 62.5 kW)
  5. CAKAP BMW CHARGING — North Canton, OH, 44720 (ChargePoint Network · Level 2 · 12 kW)
  6. CAKAP STATION - 1 — North Canton, OH, 44720 (ChargePoint Network · Level 2 · 7.7 kW)
  7. Courtyard by Marriott Canton - Tesla Destination — North Canton, OH, 44720 (Tesla Destination · Level 2 · 7.2 kW)
  8. Hilton Garden inn Akron/ Canton Airport - Tesla Destination — North Canton, OH, 44720 (Tesla Destination · Level 2 · 7.2 kW)
  9. Embassy Suites North Canton Airport — North Canton, OH, 44720 (ENVIROSPARK · Level 2 · 6.7 kW)
  10. CAIN BMW STATION 01 — North Canton, OH, 44720 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CAK AIRPORT SHORT TERM 1-2 — North Canton, OH, 44720 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For North Canton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in North Canton, Ohio?
There are 11 public electric vehicle charging locations in North Canton, Ohio, with a combined 30 individual chargers. 4 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in North Canton?
ChargePoint Network operates the most public charging locations in North Canton with 6 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in North Canton?
Level 2 EV chargers in North Canton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in North Canton?
Most North Canton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in North Canton?
A typical commercial Level 2 installation in North Canton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in North Canton take to become profitable?
Payback in North Canton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage