Install EV chargers or analyze a site in North Canton, Ohio. 11 existing public charging locations (4 DC fast, 7 Level 2). Free 0–100 profitability score on any North Canton address from EV Data Map by Charge Rigs.
North Canton, Ohio is served by 11 public electric vehicle charging locations operating 30 individual chargers — an average of 2.7 chargers per site. Of those locations, 4 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in North Canton is ChargePoint Network with 6 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 181 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in North Canton and receive an instant ROI score, demand projection, and recommended charger configuration.
North Canton boasts a competitive public charging landscape with 11 locations provided by 5 distinct operators, with ChargePoint Network leading at 55% of sites. This diverse offering not only enhances pricing and uptime but also allows drivers to make informed choices based on power and amenities. The city features a modern mix of charging options: 36% are fast chargers, averaging 181 kW, including a standout site delivering 350 kW. Half of the fast locations operate at 150 kW or above, positioning North Canton favorably against other nearby cities. With about 16 DC fast ports available, the local infrastructure offers robust support for a growing EV market, allowing for targeted filling of service gaps based on user demand.
DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 2.7. Average DC fast power: 181 kW.
The following operators run public charging in North Canton, ranked by number of locations.
A selection of higher-power public charging locations across North Canton, sorted by power level.
Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For North Canton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.