Install EV chargers or analyze a site in Warren, Ohio. 10 existing public charging locations (4 DC fast, 6 Level 2). Free 0–100 profitability score on any Warren address from EV Data Map by Charge Rigs.
Warren, Ohio is served by 10 public electric vehicle charging locations operating 18 individual chargers — an average of 1.8 chargers per site. Of those locations, 4 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Warren is ChargePoint Network with 4 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 88 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Warren and receive an instant ROI score, demand projection, and recommended charger configuration.
Warren, Ohio's EV charging landscape is defined by its balanced mix of 10 public charging locations, with 40% offering DC fast charging overseen by four different networks, predominantly ChargePoint. With an average power output of 88 kW and a peak of 120 kW, the city's fast chargers cater well to those seeking rapid top-ups; however, they lag behind emerging technology with no chargers exceeding 150 kW. This presents an opportunity for site developers and operators to enhance the region’s offerings with higher-capacity charging solutions, ideally positioned to meet the evolving needs of EV drivers and improve overall access. With an engaging combination of charging types, Warren is poised for thoughtful growth in its EV infrastructure to support increasing demand.
DC fast share: 40% of locations. Level 2 share: 60%. Average chargers per site: 1.8. Average DC fast power: 88 kW.
The following operators run public charging in Warren, ranked by number of locations.
A selection of higher-power public charging locations across Warren, sorted by power level.
Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Warren specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.