Install EV Chargers in Willoughby, Ohio

Install EV chargers or analyze a site in Willoughby, Ohio. 10 existing public charging locations (1 DC fast, 9 Level 2). Free 0–100 profitability score on any Willoughby address from EV Data Map by Charge Rigs.

Willoughby, Ohio is served by 10 public electric vehicle charging locations operating 22 individual chargers — an average of 2.2 chargers per site. Of those locations, 1 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Willoughby is ChargePoint Network with 9 locations, followed by IONNA with 1. Average DC fast power across the city is approximately 400 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Willoughby and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Willoughby

Willoughby, Ohio, stands out in its EV charging landscape with a concentration of facilities primarily under the ChargePoint Network, covering 90% of the 10 public charging locations. This reliance on a single operator emphasizes network reliability and pricing consistency, essential factors for any new site developer. Notably, the city's only DC fast charging station boasts an impressive average power output of 400 kW, making it one of the most powerful options available in the area. With all DC fast sites classified at 150 kW or higher, entering the market with stations around 150–350 kW could capitalize on demand from local drivers seeking fast-charge solutions. Given the unique mix of DC fast and Level 2 charging options, savvy developers will find opportunities to address any service gaps based on traffic patterns and demographics in Willoughby.

Willoughby charging by the numbers

Locations
10
Chargers
22
DC Fast locations
1
Level 2 locations
9

DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 2.2. Average DC fast power: 400 kW.

Willoughby charging — local snapshot

Top operator share
ChargePoint Network runs 90% of public locations across 2 networks.
Average DC fast power
400 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 10 locations
Estimated DC ports
10 fast-charging ports city-wide

Charging networks in Willoughby

The following operators run public charging in Willoughby, ranked by number of locations.

Featured charging locations in Willoughby

A selection of higher-power public charging locations across Willoughby, sorted by power level.

  1. Willoughby, OH Rechargery @ Sheetz - OH 306 — Willoughby, OH, 44094 (IONNA · DC Fast · 400 kW)
  2. CRW3 CENTRAL STATION 2A — Willoughby, OH, 44094 (ChargePoint Network · Level 2 · 7.7 kW)
  3. WILLOUGHBY STATION1 — Willoughby, OH, 44094 (ChargePoint Network · Level 2 · 6.5 kW)
  4. WILLOUGHBY STATION2 — Willoughby, OH, 44094 (ChargePoint Network · Level 2 · 6.5 kW)
  5. LEIKIN MOTOR CO GUEST PARKING — Willoughby, OH, 44094 (ChargePoint Network · Level 2 · 6.5 kW)
  6. CRW3 CENTRAL STATION 2B — Willoughby, OH, 44094 (ChargePoint Network · Level 2 · 5.8 kW)
  7. CRW3 CENTRAL STATION 1A — Willoughby, OH, 44094 (ChargePoint Network · Level 2 · 3.8 kW)
  8. CRW3 CENTRAL STATION 3A — Willoughby, OH, 44094 (ChargePoint Network · Level 2 · 3.8 kW)
  9. CRW3 CENTRAL STATION 3B — Willoughby, OH, 44094 (ChargePoint Network · Level 2 · 3.8 kW)
  10. CRW3 CENTRAL STATION 1B — Willoughby, OH, 44094 (ChargePoint Network · Level 2 · 3.8 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Willoughby specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Willoughby, Ohio?
There are 10 public electric vehicle charging locations in Willoughby, Ohio, with a combined 22 individual chargers. 1 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Willoughby?
ChargePoint Network operates the most public charging locations in Willoughby with 9 sites, followed by IONNA with 1 sites.
How much does it cost to install an EV charger in Willoughby?
Level 2 EV chargers in Willoughby typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Willoughby?
Most Willoughby projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Willoughby?
A typical commercial Level 2 installation in Willoughby energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Willoughby take to become profitable?
Payback in Willoughby depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage