Install EV Chargers in Youngstown, Ohio

Install EV chargers or analyze a site in Youngstown, Ohio. 14 existing public charging locations (3 DC fast, 11 Level 2). Free 0–100 profitability score on any Youngstown address from EV Data Map by Charge Rigs.

Youngstown, Ohio is served by 14 public electric vehicle charging locations operating 38 individual chargers — an average of 2.7 chargers per site. Of those locations, 3 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Youngstown is ChargePoint Network with 6 locations, followed by Non-Networked with 5. Average DC fast power across the city is approximately 180 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Youngstown and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Youngstown

Youngstown boasts a vibrant public charging landscape with 14 locations featuring distinct operators, which fosters competitive pricing and service reliability. With 21% of these sites equipped as DC fast chargers, drivers benefit from an impressive average output of 180 kW and access to a peak power stall of 240 kW, reflecting a modern high-powered charging fleet. Notably, 67% of the DC fast locations provide 150 kW or greater, appealing to those seeking quick top-ups. The diverse mix of five operators, led by ChargePoint Network, encourages users to prioritize charging speed and amenities based on their preferences, enhancing the decision-making process for local EV drivers. This unique market structure positions Youngstown as a forward-thinking hub for electric vehicle charging.

Youngstown charging by the numbers

Locations
14
Chargers
38
DC Fast locations
3
Level 2 locations
11

DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 2.7. Average DC fast power: 180 kW.

Youngstown charging — local snapshot

Top operator share
ChargePoint Network runs 43% of public locations across 5 networks.
Average DC fast power
180 kW (fastest stall: 240 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
21% DC fast / 79% Level 2 across 14 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in Youngstown

The following operators run public charging in Youngstown, ranked by number of locations.

Featured charging locations in Youngstown

A selection of higher-power public charging locations across Youngstown, sorted by power level.

  1. #1 Cochran Ford Austintown — Youngstown, OH, 44515 (FORD_CHARGE · DC Fast · 240 kW)
  2. Youngstown OH — Youngstown, OH, 44512 (SHELL_RECHARGE · DC Fast · 180 kW)
  3. COCHRANAUTO BOARDMANFORDL — Youngstown, OH, 44512 (ChargePoint Network · DC Fast · 120 kW)
  4. COCHRANAUTO BOARDMANFORD L2 — Youngstown, OH, 44512 (ChargePoint Network · Level 2 · 19.2 kW)
  5. MITSUBISHI 7C MITSUBISHI MAIN — Youngstown, OH, 44515 (ChargePoint Network · Level 2 · 9.6 kW)
  6. Akron Children’s Hospital — Youngstown, OH, 44512 (Non-Networked · Level 2 · 8 kW)
  7. Hollywood Gaming at Mahoning Valley Race Course — Youngstown, OH, 44515 (Non-Networked · Level 2 · 7.2 kW)
  8. The Public Library of Youngstown & Mahoning County — Youngstown, OH, 44503 (Non-Networked · Level 2 · 7.2 kW)
  9. Greenwood Chevrolet — Youngstown, OH, 44515 (Non-Networked · Level 2 · 7.2 kW)
  10. Donnell Ford — Youngstown, OH, 44512 (Non-Networked · Level 2 · 7.2 kW)
  11. 604 MAHONING STATION 1 — Youngstown, OH, 44502 (ChargePoint Network · Level 2 · 6.5 kW)
  12. 604 MAHONING STATION 2 — Youngstown, OH, 44502 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Youngstown specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Youngstown, Ohio?
There are 14 public electric vehicle charging locations in Youngstown, Ohio, with a combined 38 individual chargers. 3 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Youngstown?
ChargePoint Network operates the most public charging locations in Youngstown with 6 sites, followed by Non-Networked with 5 sites.
How much does it cost to install an EV charger in Youngstown?
Level 2 EV chargers in Youngstown typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Youngstown?
Most Youngstown projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Youngstown?
A typical commercial Level 2 installation in Youngstown energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Youngstown take to become profitable?
Payback in Youngstown depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.