Install EV Chargers in Grand Ronde, Oregon

Install EV chargers or analyze a site in Grand Ronde, Oregon. 11 existing public charging locations (1 DC fast, 10 Level 2). Free 0–100 profitability score on any Grand Ronde address from EV Data Map by Charge Rigs.

Grand Ronde, Oregon is served by 11 public electric vehicle charging locations operating 22 individual chargers — an average of 2.0 chargers per site. Of those locations, 1 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Grand Ronde is ChargePoint Network with 10 locations, followed by EVCS with 1. Average DC fast power across the city is approximately 50 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Grand Ronde and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Grand Ronde

Grand Ronde, Oregon's public charging landscape is significantly shaped by ChargePoint Network, which governs 91% of the 11 available locations, underscoring a reliance on a single provider for charging consistency and reliability. With only one DC fast charging site averaging 50 kW and no options exceeding this legacy power level, there is a notable opportunity for new entrants to establish a competitive edge with higher-capacity chargers. Currently, the mix is tilted towards Level 2 charging, meeting longer-dwell needs, but the limited fast charging infrastructure presents unique gaps. This scenario creates potential for strategic site development that caters to EV drivers seeking faster charging solutions, while EV Data Map can help analyze local demand dynamics to identify the most impactful locations for new installations.

Grand Ronde charging by the numbers

Locations
11
Chargers
22
DC Fast locations
1
Level 2 locations
10

DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 2.0. Average DC fast power: 50 kW.

Grand Ronde charging — local snapshot

Top operator share
ChargePoint Network runs 91% of public locations across 2 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 11 locations
Estimated DC ports
1 fast-charging ports city-wide

Charging networks in Grand Ronde

The following operators run public charging in Grand Ronde, ranked by number of locations.

Featured charging locations in Grand Ronde

A selection of higher-power public charging locations across Grand Ronde, sorted by power level.

  1. WCEH Grand Ronde — Grand Ronde, OR, 97347 (EVCS · DC Fast · 50 kW)
  2. SPIRITMOUNTAIN GREEN LOT #1 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 19.2 kW)
  3. SPIRITMOUNTAIN GREEN LOT #2 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 12 kW)
  4. SPIRITMOUNTAIN GREEN LOT #3 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 12 kW)
  5. SPIRITMOUNTAIN GREEN LOT #5 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 12 kW)
  6. SPIRITMOUNTAIN GREEN LOT #4 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 12 kW)
  7. SPIRITMOUNTAIN BLACK LOT #1 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 7.7 kW)
  8. SPIRITMOUNTAIN BLACK LOT #2 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 7.7 kW)
  9. SPIRITMOUNTAIN EMP ORG LOT 2 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 6.5 kW)
  10. SPIRITMOUNTAIN EMP ORG LOT 1 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 6.5 kW)
  11. SPIRITMOUNTAIN ORG LOT 3 — Grand Ronde, OR, 97347 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Grand Ronde specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Grand Ronde, Oregon?
There are 11 public electric vehicle charging locations in Grand Ronde, Oregon, with a combined 22 individual chargers. 1 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Grand Ronde?
ChargePoint Network operates the most public charging locations in Grand Ronde with 10 sites, followed by EVCS with 1 sites.
How much does it cost to install an EV charger in Grand Ronde?
Level 2 EV chargers in Grand Ronde typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Grand Ronde?
Most Grand Ronde projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Grand Ronde?
A typical commercial Level 2 installation in Grand Ronde energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Grand Ronde take to become profitable?
Payback in Grand Ronde depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage