Install EV Chargers in Tillamook, Oregon

Install EV chargers or analyze a site in Tillamook, Oregon. 15 existing public charging locations (4 DC fast, 11 Level 2). Free 0–100 profitability score on any Tillamook address from EV Data Map by Charge Rigs.

Tillamook, Oregon is served by 15 public electric vehicle charging locations operating 42 individual chargers — an average of 2.8 chargers per site. Of those locations, 4 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Tillamook is ChargePoint Network with 6 locations, followed by FLO with 3. Average DC fast power across the city is approximately 106 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Tillamook and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Tillamook

Tillamook runs a comparatively competitive public charging market: 7 distinct operators share its 15 locations, with ChargePoint Network the largest at 40% of sites. That diversity tends to keep pricing and uptime competitive but also makes corridor-style site selection more nuanced — drivers in Tillamook pick on power and amenity rather than defaulting to a single brand. The 4 DC fast locations average 106 kW, with the fastest site at 250 kW. That is a mid-power fleet by current US standards; 25% of DC fast sites are 150 kW-class or higher. New entrants pricing around 150–350 kW hardware will sit at the top of the local power curve, which matters for driver selection in nav apps. By mix, 27% of Tillamook's public locations are DC fast and the rest serve longer-dwell Level 2 demand, with roughly 15 DC fast ports across the city. EV Data Map scores any Tillamook address against this footprint and the surrounding traffic, demographics and grid context to surface the gaps worth filling first.

Tillamook charging by the numbers

Locations
15
Chargers
42
DC Fast locations
4
Level 2 locations
11

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 2.8. Average DC fast power: 106 kW.

Tillamook charging — local snapshot

Top operator share
ChargePoint Network runs 40% of public locations across 7 networks.
Average DC fast power
106 kW (fastest stall: 250 kW)
High-power share
25% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 15 locations
Estimated DC ports
15 fast-charging ports city-wide

Charging networks in Tillamook

The following operators run public charging in Tillamook, ranked by number of locations.

Featured charging locations in Tillamook

A selection of higher-power public charging locations across Tillamook, sorted by power level.

  1. Tillamook OR - Tesla Supercharger — Tillamook, OR, 97141 (Tesla · DC Fast · 250 kW)
  2. SOUTH LOT NE LEFT — Tillamook, OR, 97141 (ChargePoint Network · DC Fast · 62.5 kW)
  3. SOUTH LOT SPOT 3 — Tillamook, OR, 97141 (ChargePoint Network · DC Fast · 62.5 kW)
  4. WCEH Tillamook — Tillamook, OR, 97141 (EVCS · DC Fast · 50 kW)
  5. Port of Tillamook Bay Offices Station — Tillamook, OR, 97141 (FLO · Level 2 · 19.2 kW)
  6. Tillamook Blimp Hanger — Tillamook, OR, 97141 (FLO · Level 2 · 19.2 kW)
  7. Tillamook Officer's Mess Station — Tillamook, OR, 97141 (FLO · Level 2 · 16.6 kW)
  8. Cape Lookout — Tillamook, OR, 97141 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  9. Tillamook Creamery - Tesla Destination — Tillamook, OR, 97141 (Tesla Destination · Level 2 · 7.2 kW)
  10. Tillamook Creamery — Tillamook, OR, 97141 (Non-Networked · Level 2 · 7.2 kW)
  11. Blue Heron French Cheese Co - Tesla Destination — Tillamook, OR, 97141 (Tesla Destination · Level 2 · 7.2 kW)
  12. SOUTH LOT NE RIGHT — Tillamook, OR, 97141 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Tillamook specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Tillamook, Oregon?
There are 15 public electric vehicle charging locations in Tillamook, Oregon, with a combined 42 individual chargers. 4 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Tillamook?
ChargePoint Network operates the most public charging locations in Tillamook with 6 sites, followed by FLO with 3 sites.
How much does it cost to install an EV charger in Tillamook?
Level 2 EV chargers in Tillamook typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Tillamook?
Most Tillamook projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Tillamook?
A typical commercial Level 2 installation in Tillamook energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Tillamook take to become profitable?
Payback in Tillamook depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.